My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 111022
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 111022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 1:20:10 PM
Creation date
3/21/2024 11:34:09 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/10/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xcel Energy— Site Plan, CUP Amendment, Variance, Easement Vacation <br /> progresses. Staff will continue to work with the applicant the ensure that any exterior <br /> mechanical equipment will be adequately screened. <br /> Streets and Access <br /> The existing facilities on the property are adequately served with two access points onto <br /> Fenway Boulevard N. The applicant is proposing an additional access point to the north of <br /> the proposed new building, as well as a widening of the existing curb cut near the existing <br /> building to 33 feet. The proposed new and modified access points meet City Code <br /> requirements. <br /> Parking <br /> Per City Code the parking required for the building and facility is 186 parking stalled. The <br /> applicant has stated at the peak of training on the site more parking stalls may be needed. <br /> The plans show a total of 317 parking spaces. The applicant is proposed to construct 229 <br /> stalls and shows 110 parking stalls as deferred parking. The deferred parking would be <br /> constructed at any time deemed necessary by the City, if a parking problem occurs. The <br /> parking spaces meets the ordinance standard. <br /> Trails <br /> There is a City trail along Fenway Boulevard N. The applicant is not proposing to impact <br /> this trail or provide any additional trails. If the trail is impacted, the applicant will be <br /> responsible for replacement of the trail. <br /> Architecture, Building Material <br /> The applicant has provided floor plans,elevations,and renderings of the proposed building. <br /> The architecture of the building will be subject to the Commercial and Industrial Design <br /> Guidelines adopted by the City in 2011. The guidelines encourage four-sided design with <br /> at least one change in wall planes and roof lines to provide depth. The applicant has <br /> proposed a mixture of concrete panels and wood-like metal materials to create a light and <br /> dark contrast across the facades of all four sides of the building. The applicant is at 25% <br /> for the metal material and will need to reduce it to 20%per the commercial and industrial <br /> design standards. In general, the applicant has done a good job meeting the intent of the <br /> commercial and industrial design guidelines. Staff has requested that the applicant provide <br /> material samples to ensure that the proposed metal building material, and that the color, <br /> texture, and design of the other building materials are attractive and aesthetically pleasing. <br /> Signage <br /> The applicant is proposing a wall sign to be placed on the front facade of the building. Sec. <br /> 90-265(h)(1)(a) restricts single-tenant wall signs to a maximum of 10 percent of the gross <br /> wall area of the front fagade. The applicant will need to provide dimensions of the wall <br /> sign prior to issuance of a sign permit. The applicant has mentioned the possibility of <br /> constructing one or more directional monument signs to assist in the direction of visitors <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.