My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 111022
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 111022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 1:20:10 PM
Creation date
3/21/2024 11:34:09 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/10/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Xcel Energy— Site Plan, CUP Amendment, Variance, Easement Vacation <br /> attending training events. Staff will review these potential monument signs prior to the <br /> issuance of a sign permit. <br /> Drainage/Grading <br /> The applicant is proposing stormwater management through two infiltration basins, one <br /> located near the west property line and one located between the proposed building and <br /> substation. The stormwater ponds are proposed to be constructed in existing low-lying <br /> wetland areas, minimizing the need for additional grading. The proposed impervious <br /> surface is not shown to drain to the infiltration basins,and the applicant will need to provide <br /> treatment plans prior to future permitting. However, the applicant's stormwater <br /> management plan generally meets the City's water quality and rate control standards. Staff <br /> will continue to work with the applicant on addressing the technical comments related to <br /> their stormwater management plan prior to the issuance of a stormwater permit. <br /> Utilities <br /> The applicant plans to connect to city sewer and water stubs which are available for the <br /> northerly portion of the property. <br /> Wetlands <br /> The applicant is proposing to impact 0.39 acres of wetland, mitigated by the purchase of <br /> wetland credits. A wetland replacement plan application was received by the City on <br /> September 27, 2022, and is under review by the Technical Evaluation Panel (TEP). <br /> Indications from the TEP state that the proposal would meet the requirements for impact. <br /> Park Dedication <br /> Park dedication is not required for the proposed use. <br /> It is in staff s opinion that the applicant has met all the necessary requirements to approve <br /> their site plan. <br /> 5. CONDITIONAL USE PERMIT AMENDMENT <br /> The applicant is proposing to expand outdoor storage with construction of new training <br /> transmission lines and a training substation. Since the area is expanding beyond the portion <br /> of the property covered by the original conditional use permit and subsequent amendments, <br /> a conditional use permit amendment is required. <br /> The spirit and intent of the ordinance is to allow exterior storage larger than the principal <br /> building, provided that it is adequately screened from view of adjacent properties. The <br /> applicant is proposing to screen the outdoor facilities by way of existing mature wooded <br /> area, fencing, and the proposed approximately 35,000 square foot building on site. Staff is <br /> comfortable with the proposed location of the transmission lines and substation, and is of <br /> the opinion that they will be adequately screened. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.