My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 111022
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 111022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 1:20:10 PM
Creation date
3/21/2024 11:34:09 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/10/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hugo Training Center (HTC) Site Narrative <br /> In addition to improving In-Processing operations, our training personnel see the opportunity to relocate <br /> training operations now hosted at the Riverside Training Center(RTC),which is over 90 years old.This <br /> will allow us to centralize Xcel Energy Technical Training staff in Hugo, creating operating efficiencies <br /> and improving the sharing of resources across our training programs.The project includes construction <br /> of virtual training classrooms,to lower training costs as well as provide needed space to train the <br /> workforce of the future in Renewable Energy technologies. <br /> • Expected employee use: <br /> • Up to 225 employees during peak times (contractors and staff) over 6-weeks in Spring <br /> and Fall. <br /> • 65-150 per day during off peak times. <br /> Estimated Schedule (Project 2 of 2): <br /> • Design & Permitting: Summer-Fall 2023 <br /> Construction: 20 24-2026 <br /> Requested City Actions: <br /> Site Plan Approval <br /> The applicant is requesting site plan approval for the above mentioned project. Plans have been <br /> included in support of the application and its consistency with the existing Business Park Zoning District <br /> can be summarized as follows: <br /> Building Setbacks: <br /> Proposed Front Setback=111 feet from Fenway Boulevard. <br /> Proposed Rear Setback=752 feet from westerly property line. <br /> Proposed Side Setback=231 feet from northerly property line. <br /> The proposal exceeds the required 30-foot front and rear setback and side yard setback equal to the <br /> height of the building, in no case less than 10 feet. Additional setback has been provided by the Owner <br /> to allow for greater screening to support the variance request. <br /> Building Coverage and Lot Coverage: <br /> Proposed Building Area=5.7%. <br /> Proposed Impervious Area=41.9% <br /> The proposal meets the maximum lot are a cover by a building of 40%and lot area to be covered by <br /> impervious surface of 80%. <br /> Landscape: <br /> The required landscape requirements for this project were calculated using either the perimeter of the <br /> site or the building square footage. Quantities have been included for whichever calculation is greater. <br /> Based on these calculation the following landscaping is required: <br /> Required overstory deciduous trees=47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.