My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 111022
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 111022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 1:20:10 PM
Creation date
3/21/2024 11:34:09 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/10/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hugo Training Center (HTC) Site Narrative <br /> Mechanical Equipment Screening: <br /> Mechanical equipment for the proposed building will either be located on the ground or internal of the <br /> building.As the mechanical equipment layout progresses, a screening design will be designed to meet <br /> Section 90-272 Code Requirements. Plans will be updated to show more detail for the mechanical <br /> equipment and associated screening for City review and approval prior to issuance of building permits. <br /> Street and Access: <br /> The property currently has two access points from Fenway Boulevard.The project proposing one <br /> addition access point just north of the In-Processing Building and widening of the existing curb cut near <br /> the existing building.The north access is being proposed to be 24 feet wide and the existing access is <br /> being proposed to be 33 feet wide. Spacing for all proposed and modify access points exceed 150 feet. <br /> These access points meet the requirements of Section 90-222. <br /> Parking: <br /> Parking Required=186 Stalls. <br /> Proposed Parking Provided=329 Stalls. <br /> The proposal exceeds the required parking outlined in Section 90-253. Xcel is proposing to exceed the <br /> requirement number of parking stalls to meet the demand of anticipated Staff training events. <br /> Trails: <br /> There is a City trail along Fenway Boulevard North. Xcel is not proposing additional trails with this <br /> development. <br /> Building Architecture: <br /> Floor plans, elevations, and building renderings have been provided. <br /> Drainage/Grading: <br /> Treatment for stormwater runoff is being provided for both of the Transmission Line/Substation and In- <br /> Processing Building projects as part of this application.Supporting plans and hydrology calculations have <br /> been provided to confirm these basins meet the City of Hugo Stormwater Requirements and Policies. <br /> The property currently has two access points from Fenway Boulevard. <br /> Currently the site drains to the existing wetland or to the parcel just west of the Xcel property. Proposed <br /> drainage patterns will be similar to the existing drainage patterns and include two separate infiltrations <br /> basin which will ultimately overtop to the property to the west. <br /> Utilities: <br /> The proposed building will be served by existing sanitary and watermain service stubs adjacent to the <br /> property. <br /> Wetlands: <br /> Wetlands existing on the westerly side of the parcel and interior of the site near the proposed building. <br /> Xcel proposes to fill and mitigate the wetland in the interior of the site to allow for the required <br />
The URL can be used to link to this page
Your browser does not support the video tag.