My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 111022
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2022 PC Packets
>
PC PACKET 111022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:43:20 AM
Creation date
3/21/2024 11:34:09 AM
Metadata
Fields
Template:
Commissions
Meeting Date
11/10/2022
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hugo Training Center (HTC) Site Narrative <br /> <br />Mechanical Equipment Screening: <br />Mechanical equipment for the proposed building will either be located on the ground or internal of the <br />building. As the mechanical equipment layout progresses, a screening design will be designed to meet <br />Section 90-272 Code Requirements. Plans will be updated to show more detail for the mechanical <br />equipment and associated screening for City review and approval prior to issuance of building permits. <br />Street and Access: <br />The property currently has two access points from Fenway Boulevard. The project proposing one <br />addition access point just north of the In-Processing Building and widening of the existing curb cut near <br />the existing building. The north access is being proposed to be 24 feet wide and the existing access is <br />being proposed to be 33 feet wide. Spacing for all proposed and modify access points exceed 150 feet. <br />These access points meet the requirements of Section 90-222. <br />Parking: <br />Parking Required=186 Stalls. <br />Proposed Parking Provided=329 Stalls. <br />The proposal exceeds the required parking outlined in Section 90-253. Xcel is proposing to exceed the <br />requirement number of parking stalls to meet the demand of anticipated Staff training events. <br />Trails: <br />There is a City trail along Fenway Boulevard North. Xcel is not proposing additional trails with this <br />development. <br />Building Architecture: <br />Floor plans, elevations, and building renderings have been provided. <br />Drainage/Grading: <br />Treatment for stormwater runoff is being provided for both of the Transmission Line/Substation and In- <br />Processing Building projects as part of this application. Supporting plans and hydrology calculations have <br />been provided to confirm these basins meet the City of Hugo Stormwater Requirements and Policies. <br />The property currently has two access points from Fenway Boulevard. <br />Currently the site drains to the existing wetland or to the parcel just west of the Xcel property. Proposed <br />drainage patterns will be similar to the existing drainage patterns and include two separate infiltrations <br />basin which will ultimately overtop to the property to the west. <br />Utilities: <br />The proposed building will be served by existing sanitary and watermain service stubs adjacent to the <br />property. <br />Wetlands: <br />Wetlands existing on the westerly side of the parcel and interior of the site near the proposed building. <br />Xcel proposes to fill and mitigate the wetland in the interior of the site to allow for the required
The URL can be used to link to this page
Your browser does not support the video tag.