Laserfiche WebLink
Hugo Training Center (HTC) Site Narrative <br /> improvements to the parcel.The proposed wetland to be filled is approximately 0.39 Acres in size and <br /> will be mitigated per City requirements using purchased Wetland Credits.A completed City Wetland <br /> Services Form has been included in this submittal. <br /> Conditional Use Permit(CUP)Amendment <br /> Xcel is requesting an amendment to the existing Conditional Use Permit to expand an outdoor electric <br /> training area.The proposed project meets the findings required for approval as follows: <br /> The proposed use is permissible by law. <br /> Exterior storage is an allowed conditional use as long as it is adequately screened. Based on the <br /> placement of the training area, location of the proposed In-Processing Building, existing vegetation, and <br /> proposed landscaping we believe the proposed plan is permissible. <br /> The proposed use is in keeping with the spirit and intent. <br /> The intent of the ordinance is to allow for exterior storage larger than the principal structure as long as it <br /> is adequately screened. Based on the placement of the training area, location of the proposed In- <br /> Processing Building, existing vegetation, and proposed landscaping we believe the proposed plan is in <br /> keeping with the intent of the code. <br /> The proposed use is compatible with the city's comprehensive plan,and the character of the <br /> surrounding area. <br /> The comprehensive plan identifies this parcel as Business Park(BP).The character and the zoning of this <br /> area is largely industrial with additional BP Zoned Parcels.There are residential properties to the north <br /> and south of the proposed project but there are significant buffers of woodland, existing commercial <br /> buildings, and proposed landscaping to screen the Training Area from the residential properties.We <br /> believe the proposed project is compatible with existing uses of this parcel and with the character of the <br /> area. <br /> The proposed use has adequate drainage,water supply,electrical,gas, and sewage treatment <br /> facilities. <br /> The site has proposed utilities stubbed into the area to adequate serve the proposed building. <br /> Drainage and stormwater management are being provided to allow for positive drainage away from the <br /> proposed building and training areas to meet City requirements. <br /> The proposed use has adequate road access,and does not reduce the safety or capacity of the public <br /> road system. <br /> The proposed project is providing access point's accordance to City requirements to Fenway that will <br /> allow for safe pedestrian and vehicular movements into and out of the Xcel site. <br /> The technical evaluation of the floodplain, if required,accurately represents the conditions and <br /> boundaries of the floodplain area,as well as correctly represents the proposed use's impact on the <br /> floodplain. <br /> The project doesn't propose to impact any existing floodplain areas. <br />