Laserfiche WebLink
Hugo Training Center (HTC) Site Narrative <br /> The proposed use may not create a danger that materials may be swept onto other lands, or <br /> downstream to the injury of others, or block bridges,culverts, or other hydraulics. <br /> Temporary erosion control measures will be installed as part of construction in accordance to the <br /> approved Storm Water Pollution Prevention Plan (SWPPP). In addition to the temporary erosion control <br /> measure permanent stormwater management practices are being installed to quality and quantity to <br /> the runoff leaving the site. <br /> The proposed use will not damage or reduce the benefits the public receives from the public waters. <br /> Temporary erosion control measures will be installed as part of construction in accordance to the <br /> approved Storm Water Pollution Prevention Plan (SWPPP). In addition to the temporary erosion control <br /> measure permanent stormwater management practices are being installed to quality and quantity to <br /> the runoff leaving the site. <br /> If located in the shoreland overlay district,all structures and facilities are screened from view from <br /> public waters. <br /> The project is not located in an existing shoreland overlay district. <br /> If the permit is to approve a wetlands replacement plan,the plan is in conformance with the rules of <br /> the state board of the soil and water resources for such plans. <br /> Xcel is proposing filling an existing wetland onsite as part of this project.The project has been <br /> delineated and the delineation has been approved by the LGU and the TEP Panel.An application <br /> proposing this wetland fill and replacement using wetland credits has been submitted as part of this <br /> review. We believe this process is in conformance with the rules of the state. <br /> The applicant or operator shall obtain all necessary state and local permits for the conditional use. <br /> We believe with the site plan review, conditional use amendment,variance request, easement vacation, <br /> and wetland modification applications we meet these requirements. <br /> The proposed use is adequately buffered and screened from noncompatible land uses and public <br /> rights-of-way. <br /> We believe with the placement of the training area, location of the proposed In-Processing Building, <br /> existing vegetation, and proposed landscaping we believe the proposed plan is adequately buffered. <br /> Variance Request <br /> Xcel is requesting a variance to allow for a structures contain as part of the proposed training facility to <br /> exceed the 50-foot maximum allowed in the BP Zoning District.The proposed project meets the findings <br /> required for approval as follows: <br /> The variance as requested is permissible by law. <br /> The training center is a permissible use in the Business Park Zoning District.Additionally,the proposed <br /> Transmission lines are similar in nature to existing operable utility poles located around the City of Hugo. <br /> The proposed height of the towers are what the Xcel Team feels is required for their Staff to gain the <br /> training they need for real world situations. We believe the proposed plan minimizes adverse visual <br /> effects therefore is permissible by law. <br />