STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 2 OR 2 <br />STABILIZATION TIME FRAMES <br />ALL AREAS DISTURBED BY CONSTRUCTION WILL RECEIVE SEED OR SOD ACCORDING TO THE PLANS AND <br />SPECIFICATIONS AND WITHIN THE SPECIFIED VEGETATIVE TIME SCHEDULE. FINAL STABILIZATION WILL <br />OCCUR WHEN THE SITE HAS A UNIFORM VEGETATIVE COVER WITH A DENSITY OF 70% OVER THE ENTIRE <br />DISTURBED AREA COMPARED TO EXISTING CONDITIONS. ALL TEMPORARY SYNTHETIC EROSION <br />PREVENTION AND SEDIMENT CONTROL BMPS MUST BE REMOVED AS PART OF THE SITE FINAL <br />STABILIZATION. ALL SEDIMENT MUST BE CLEANED OUT OF CONVEYANCES AND TEMPORARY <br />SEDIMENTATION BASINS IF APPLICABLE. <br />1.INITIATE INLET STABILIZATION IMMEDIATELY WHEN CONSTRUCTION HAS TEMPORARILY OR <br />PERMANENTLY CEASED ON ANY PORTION OF THE SITE. COMPLETE STABILIZATION WITHIN THE TIME <br />FRAME LISTED. IN MANY INSTANCES THIS WILL REQUIRE STABILIZATION TO OCCUR MORE THAN ONCE <br />DURING THE COURSE OF THE PROJECT. TEMPORARY SOIL STOCKPILES WITHOUT SIGNIFICANT CLAY <br />OR SILT AND STOCKPILED AND CONSTRUCTED ROAD BASE ARE NOT APPROPRIATE AND THEREFORE <br />EXEMPT FROM THE STABILIZATION REQUIREMENT. <br />2.APPLICATION OF MULCH, HYDROMULCH, TACKIFIER AND POLYACRYLAMIDE ARE NOT ACCEPTABLE <br />STABILIZATION METHODS IN THESE AREAS. <br />3.STABILIZE ALL AREAS OF THE SITE PRIOR TO THE ONSET OF WINTER, ANY WORK STILL BEING <br />PERFORMED WILL BE SNOW MULCHED, SEEDED, AND BLANKETED WITHIN THE TIME FRAMES IN THE <br />NPDES PERMIT. <br />4.TOPSOIL BERMS MUST BE STABILIZED IN ORDER TO BE CONSIDERED PERIMETER CONTROL BMPS. <br />USE RAPID STABILIZATION METHOD 2, 3, OR 4 AS DIRECTED BY THE ENGINEER. THE SEED MIX USED IN <br />THE RAPID STABILIZATION MAY BE SUBSTITUTED AS FOLLOWS: <br />A.SINGLE YEAR CONSTRUCTION BETWEEN MAY 1 - AUGUST 1, SEED WITH SEED MIXTURE 21.111 <br />B.SINGLE YEAR CONSTRUCTION BETWEEN AUGUST 1 AND OCTOBER 31, SEED WITH SEED <br />MIXTURE 21-112 <br />C.MULTI YEAR CONSTRUCTION 22-111 <br />5.KEEP DITCHES AND EXPOSED SOILS IN AN EVEN ROUGH GRADED CONDITION IN ORDER TO BE ABLE <br />TO APPLY EROSION CONTROL MULCHES, HYDROMULCHES AND BLANKETS. <br />GENERAL SWPPP NOTES FOR CONSTRUCTION ACTIVITY <br />1.CONTRACTOR SHALL AMEND THE SWPPP AND DOCUMENT ANY AND ALL CHANGES TO THE SWPPP <br />AND ASSOCIATED PLAN SHEETS WITHIN 7 DAYS UPON IMPLEMENTATION. STORE THE SWPPP AND ALL <br />AMENDMENTS ON SITE AT ALL TIMES. <br />2.PREPARE AND SUBMIT A SITE MANAGEMENT PLAN FOR THE ENGINEER'S ACCEPTANCE FOR <br />CONCRETE MANAGEMENT, CONCRETE SLURRY APPLICATION AREAS, WORK IN AND NEAR AREAS OF <br />ENVIRONMENTAL SENSITIVITY, AREAS IDENTIFIED IN THE PLANS AS "SITE MANAGEMENT PLAN AREA", <br />ANY WORK THAT WILL REQUIRE DEWATERING, AND AS REQUESTED BY THE ENGINEER. SUBMIT ALL <br />SITE MANAGEMENT PLANS TO THE ENGINEER IN WRITING. ALLOW ALL MINIMUM OF 7 DAYS FOR THE <br />ENGINEER TO REVIEW AND ACCEPT SITE MANAGEMENT PLAN SUBMITTALS. WORK WILL NOT BE <br />ALLOWED TO COMMENCE IF A SITE MANAGEMENT PLAN IS REQUIRED UNTIL ACCEPTANCE HAS BEEN <br />GRANTED BY THE ENGINEER. THERE WILL BE NO EXTRA TIME ADDED TO THE CONTRACT DUE TO THE <br />UNTIMELY SUBMITTAL. <br />3.IT IS THE DESIGNER'S INTENT THAT THE CONTRACTOR BUILD PONDS AND INSTALL EROSION <br />CONTROL BMPS BEFORE PUTTING THEM INTO ACTIVE SERVICE TO THE MAXIMUM EXTENT <br />PRACTICABLE. <br />4.BURNING OF ANY MATERIAL IS NOT ALLOWED WITHIN PROJECT BOUNDARY. <br />5.DO NOT DISTURB AREAS OUTSIDE OF THE CONSTRUCTION LIMITS. DELINEATE AREAS NOT TO BE <br />DISTURBED PRIOR TO STARTING GROUND DISTURBING ACTIVITIES. IF IT BECOMES NECESSARY TO <br />DISTURBED AREAS OUTSIDE OF THE CONSTRUCTION LIMITS OBTAIN WRITTEN PERMISSION FROM THE <br />PROJECT ENGINEER PRIOR TO PROCEEDING. PRESERVE ALL NATURAL BUFFERS SHOWN ON THE <br />PLANS. <br />6.ROUTE STORMWATER AROUND UNSTABILIZED AREAS OF THE SITE WHENEVER FEASIBLE. PROVIDE <br />EROSION CONTROL AND VELOCITY DISSIPATION DEVICES AS NEEDED TO KEEP CHANNELS FROM <br />ERODING AND TO PREVENT NUISANCE CONDITIONS AT THE OUTLET. <br />7.DIRECT DISCHARGES FROM BMPS TO VEGETATED AREA WHENEVER FEASIBLE. PROVIDE VELOCITY <br />DISSIPATION DEVICES AS NEEDED TO PREVENT EROSION. <br />8.THE EROSION PREVENTION AND SEDIMENT CONTROL BMPS SHALL BE PLACED AS NECESSARY TO <br />MINIMIZE EROSION FROM DISTURBED SURFACES AND TO CAPTURE SEDIMENT ON SITE. ALL EROSION <br />CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCEMENT OF ANY REMOVAL WORK <br />AND/OR GROUND DISTURBING ACTIVITIES COMMENCE. <br />9.ESTABLISH SEDIMENT CONTROL DEVICES ON ALL DOWN GRADIENT PERIMETERS AND UP GRADIENT <br />OF ANY BUFFER ZONES BEFORE AND UP GRADIENT LAND DISTURBING ACTIVITIES BEGIN. MAINTAIN <br />SEDIMENT CONTROL DEVICES UNTIL CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED. <br />10.LOCATE PERIMETER CONTROL ON THE CONTOUR TO CAPTURE OVERLAND, LOW-VELOCITY SHEET <br />FLOWS DOWN GRADIENT OF ALL EXPOSED SOILS AND PRIOR TO DISCHARGING TO SURFACE WATERS. <br />PLACE J-HOOKS AT A MAXIMUM OF 100 FOOT INTERVALS. <br />11.PROVIDE PERIMETER CONTROL AROUND ALL STOCKPILES. PLACE BMP A MINIMUM 5 FEET FROM THE <br />TOE OF SLOPE WHERE FEASIBLE. DO NOT PLACE STOCKPILES IN NATURAL BUFFER AREAS, SURFACE <br />WATERS OR STORMWATER CONVEYANCES. <br />12.DISCHARGE TURBID OR SEDIMENT LADEN WATER TO TEMPORARY SEDIMENT BASINS WHENEVER <br />FEASIBLE. IN THE EVENT THAT IT IS NOT FEASIBLE TO DISCHARGE THE SEDIMENT LADEN WATER TO A <br />TEMPORARY SEDIMENT BASIN, THE WATER MUST BE TREATED SO THAT IT DOES NOT CAUSE A <br />NUISANCE CONDITION IN THE RECEIVING WATERS OR TO DOWNSTREAM LANDOWNERS. CLEAN OUT <br />ALL PERMANENT STORMWATER BASINS REGARDLESS OF WHETHER USED AS TEMPORARY SEDIMENT <br />BASINS OR TEMPORARY SEDIMENT TRAPS TO THE DESIGN CAPACITY AFTER ALL UP GRADIENT LAND <br />DISTURBING ACTIVITY IS COMPLETED. <br />13.PROVIDE SCOUR PROTECTION AT ANY OUTFALL OF DEWATERING ACTIVITIES. <br />14.PROVIDE STABILIZATION IN ANY TRENCHES CUT FOR DEWATERING OR SITE DRAINING PURPOSES. <br />POLLUTION PREVENTION <br />1.PROVIDE A SPILL KIT AT EACH WORK LOCATION ON THE SITE. <br />2.STORE ALL BUILDING MATERIALS THAT HAVE THE POTENTIAL TO LEACH POLLUTANTS, PESTICIDES, <br />HERBICIDES, INSECTICIDES. FERTILIZERS, TREATMENT CHEMICALS, AND LANDSCAPE MATERIALS <br />UNDER COVER WITH SECONDARY CONTAINMENT. <br />3.PROVIDE A SECURE STORAGE AREA WITH RESTRICTED ACCESS FOR ALL HAZARDOUS MATERIALS <br />AND TOXIC WASTE. RETURN ALL HAZARDOUS MATERIALS AND TOXIC WASTE TO THE DESIGNATED <br />STORAGE AREA AT THE END OF THE BUSINESS DAY UNLESS INFEASIBLE. STORE ALL HAZARDOUS <br />MATERIALS AND TOXIC WASTE (INCLUDING BUT NOT LIMITED TO OIL, DIESEL FUEL, GASOLINE, <br />HYDRAULIC FLUIDS, PAINT, PETROLEUM BASED PRODUCTS, WOOD PRESERVATIVES, ADDITIVES, <br />CURING COMPOUNDS, AND ACIDS) IN SEALED CONTAINERS WITH SECONDARY CONTAINMENT. CLEAN <br />UP SPILLS IMMEDIATELY. <br />4.STORE, COLLECT AND DISPOSE OF ALL SOLID WASTE. <br />5.POSITION ALL PORTABLE TOILETS SO THAT THEY ARE SECURE AND CANNOT BE TIPPED OR KNOCKED <br />OVER. PROPERLY DISPOSE OF ALL SANITARY WASTE. <br />6.FUEL AND MAINTAIN VEHICLES IN A DESIGNATED CONTAINED AREA WHENEVER FEASIBLE. USE DRIP <br />PANS OR ABSORBENT MATERIALS TO PREVENT SPILLS OR LEAKED CHEMICALS FORM DISCHARGING <br />TO SURFACE WATER OR STORMWATER CONVEYANCES. PROVIDE A SPILL KIT AT EACH LOCATION <br />THAT VEHICLES AND EQUIPMENT ARE FUELED OR MAINTAINED AT. <br />7.LIMIT VEHICLE AND EQUIPMENT WASHING TO A DEFINED AREA OF THE SITE. CONTAIN RUNOFF FROM <br />THE WASHING AREA TO A TEMPORARY SEDIMENT BASIN OR OTHER EFFECTIVE CONTROL. PROPERLY <br />DISPOSE OF ALL WASTE GENERATED BY VEHICLE AND EQUIPMENT WASHING. ENGINE DEGREASING IS <br />NOT ALLOWED ON THE SITE. <br />8.PROVIDE EFFECTIVE CONTAINMENT FOR ALL LIQUID AND SOLID WASTES GENERATED BY WASHOUT <br />OF CONCRETE, STUCCO, PAINT, FORM RELEASE OILS, CURING COMPOUNDS AND OTHER <br />CONSTRUCTION MATERIALS. LIQUID AND SOLID WASHOUT WASTES MUST NOT CONTACT THE <br />GROUND. DESIGN THE CONTAINMENT SO THAT IT DOES NOT RESULT IN RUNOFF FROM THE WASHOUT <br />OPERATIONS OR CONTAINMENT AREA. <br />9.CREATE AND FOLLOW A WRITTEN DISPOSAL PLAN FOR ALL WASTE MATERIALS. INCLUDE IN THE PLAN <br />HOW THE MATERIAL WILL BE DISPOSED OF AND THE LOCATION OF THE DISPOSAL SITE. SUBMIT PLAN <br />TO THE ENGINEER. <br />10.USE METHODS AND OPERATIONAL PROCEDURES THAT PREVENT CONCRETE DUST, PARTICLES, <br />CONCRETE WASH OUT, AND OTHER CONCRETE WASTES FROM LEAVING SITE, DEPOSITING IN <br />EXISTING OR FUTURE VEGETATED AREAS, AND FROM ENTERING STORMWATER CONVEYANCE <br />SYSTEMS, INCLUDING INLETS, DITCHES AND CURB FLOW LINES. USE METHODS AND OPERATIONAL <br />PROCEDURES THAT PREVENT SAW CUT SLURRY AND PLANING WASTE FROM LEAVING SITE AND <br />FROM ENTERING STORMWATER CONVEYANCE SYSTEMS INCLUDING DITCHES AND CULVERTS. <br />RECORD RETENTION <br />THE SWPPP, ALL CHANGES TO IT AND INSPECTION AND MAINTENANCE RECORDS MUST BE KEPT ON-SITE <br />DURING CONSTRUCTION. THE OWNER MUST RETAIN A COPY OF THE SWPPP ALONG WITH THE FOLLOWING <br />RECORDS FOR THREE (3) YEARS AFTER SUBMITTAL OF THE NOTICE OF TERMINATION (NOT). <br />1.ANY OTHER PERMITS REQUIRED FOR THE PROJECT. <br />2.RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING CONSTRUCTION <br />3.ALL PERMANENT OPERATIONS AND MAINTENANCE AGREEMENT THAT HAVE BEEN IMPLEMENTED <br />INCLUDING ALL RIGHT OF WAY, CONTRACTS, COVENANTS AND OTHER BINDING REQUIREMENTS <br />REGARDING PERPETUAL MAINTENANCE; AND <br />4.ALL REQUIRED CALCULATIONS FOR DESIGN OF THE TEMPORARY AND PERMANENT STORMWATER <br />MANAGEMENT SYSTEMS. <br />SWPPP SCHEDULE OF INSTALLATION & MAINTENANCE <br />DESCRIPTION OF PERMANENT STORMWATER TREATMENT SYSTEMS <br />STORMWATER IS TREATED BY FOUR STORMWATER PONDS THROUGHOUT THE SITE. SEE STORMWATER <br />MANAGEMENT PLAN REPORT. <br />CALCULATIONS FOR TEMPORARY & PERMANENT STORMWATER TREATMENT SYSTEMS <br />SEE STORMWATER MANAGEMENT PLAN REPORT. <br />ESTIMATED BMPS QUANTITIES <br />STORM WATER POLLUTION PREVENTION PLAN NARRATIVE - PAGE 2 OR 2 <br />AREA TIME FRAME NOTES <br />LAST 200 LINEAL FEET OF DRAINAGE <br />DITCH OR SWALE <br />WITHIN 24 HOURS OF CONNECTION TO <br />SURFACE WATER OR PROPERTY EDGE 1, 2, 3 <br />REMAINING PORTIONS OF DRAINAGE <br />DITCH OR SWALE 7 DAYS 1, 3 <br />PIPE AND CULVERT OUTLETS 24 HOURS <br />STOCKPILES 7 DAYS 1 <br />ITEM INSTALLATION INSPECTION & <br />MAINTENANCE REMOVAL <br />SILT FENCE PRIOR TO COMMENCEMENT OF <br />EARTHWORK OPERATIONS. <br />INSPECT & MAINT. AFTER EACH <br />RUN-OFF EVENT. REMOVE <br />SEDIMENTS AS REQUIRED. <br />AFTER TRIBUTARY DRAINAGE <br />AREA IS RESTORED. <br />ROCK CONST. <br />ENTRANCE <br />PRIOR TO COMMENCEMENT OF <br />EARTHWORK OPERATIONS. <br />INSPECT REGULARLY. MAINTAIN <br />AS NEEDED.PRIOR TO PAVING. <br />OUTLET SKIMMER <br />STRUCTURE AFTER POND GRADING IS <br />COMPLETED. <br />INSPECT REGULARLY. MAINTAIN <br />AS NEEDED.PERMANENT. <br />RIP-RAP & <br />FILTER <br />UPON COMPLETION OF POND <br />GRADING, CONC. SWALE CONST. <br />AND OUTLET INSTALLATION. <br />INSPECT & MAINTAIN AT LEAST <br />ANNUALLY AND AFTER HEAVY <br />RAINFALL EVENT. <br />PERMANENT. <br />DETENTION POND DURING EARTHWORK <br />OPERATIONS. <br />AFTER HEAVY RAINFALL EVENTS. <br />REMOVE SEDIMENTS AS NEEDED.PERMANENT. <br />SEED & MULCH AFTER POND GRADING IS <br />COMPLETED. <br />INSPECT & MAINTAIN AFTER HEAVY <br />RAINS. REPLACE WASH-OUT <br />AREAS IMMEDIATELY <br />NO REMOVAL NECESSARY. <br />INLET PROTECTION UPON INLET CONSTRUCTING WHEN 1/3 CAPACITY OF BMP IS <br />REACHED <br />AFTER TRIBUTARY AREAS <br />ARE FULLY RESTORED <br />BMP ORIGINAL ESTIMATE MODIFICATION DATE <br />ENERGY DISSIPATER <br />TEMP. DIVERSION DIKES <br />CHECK DAMS <br />TEMP SEEDING <br />PERMANENT SEEDING <br />PERMANENT SODDING <br />MULCHES (SPECIFY TYPES) <br />CAT 3 EROSION CONTROL BLANKET <br />SOIL TACKIFIERS <br />SILT FENCING <br />EROSION CONTROL MATS <br />STORM DRAIN INLET PROTECTION <br />TEMPORARY OR PERMANENT <br />SEDIMENTATION BASINS <br />CONSTRUCTION ENTRANCE <br />DEWATERING (TREATMENT LOCATION, <br />SCHEMATIC, & SAMPLING PLAN REQUIRED <br />CONCRETE TRUCK WASHOUT <br />SWPPP - PG 2 <br />C10 <br />PLOTTED:COMM. NO. <br />DRAWING NO. <br />----17004 <br />ONEKA PRAIRIE <br />1 3 6 0 5 1 s t A v e n u e N . #1 0 0 <br />P l y m o u t h , M N 5 5 4 4 1 | a e -m n .c o m <br />P 7 6 3 .4 1 2 .4 0 0 0 | F 7 6 3 .4 1 2 .4 0 9 0 <br />A n d e r s o n E n g i n e e r i n g o f M i n n e s o t a , L L C <br />DRAWING TITLE <br />CHECKED BY:DRAWN:DESIGNED: <br />ATJRAT <br />08/09/2022 <br />REVISION LOG <br />DESCRIPTION OF REVISIONSNO.DATE <br />SOUTHWIND HOLDINGS, LLC <br />PRELIMINARY PLAT <br />51317 <br />ADAM THIELE, PEPRINT NAME: <br />SIGNATURE: <br />I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR <br />REPORT WAS PREPARED BY ME OR UNDER MY DIRECT <br />SUPERVISION AND THAT I AM A DULY LICENSED <br />PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE <br />OF MINNESOTA. <br />DATE:LICENSE NO.08/09/2022 <br />1 8/19/22 REVISED PER CITY COMMENTS <br />2 10/31/22 REVISED PER UPDATED DELINEATION <br />3 11/18/22 REVISED PER CITY COMMENTS <br />4 11/21/22 STORM SEWER REVISIONS