My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 01.12.23
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2023 PC Packets
>
PC PACKET 01.12.23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2024 11:59:24 AM
Creation date
3/21/2024 11:57:49 AM
Metadata
Fields
Template:
Commissions
Meeting Date
1/12/2023
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6 Oneka Commons Sketch Plan 2023 <br />by the County. Washington County plans show future traffic signals at the prosed access points <br />along Frenchman Road/CSAH 8 at Fenway Boulevard and Oneka Parkway. Developer <br />contributions to the cost of the traffic signal will be considered with the development of the <br />property. <br /> <br />There is a roundabout show on the plans for access to the property. Generally staff is <br />comfortable with the roundabout, however the location may need to be moved further to the <br />south to provide proper separation from the full access on CSAH 8. Additionally, the plans show <br />a proposed gas station entrance that is close to the CSAH 8 access. The access location could <br />cause impacts to the future signal location and roundabout. The access should be relocated to <br />Victor Path. <br /> <br />The development of this property result in in the construction of a portion of Victor Path <br />(frontage road) and Fenway Boulevard. This would require connecting to Fenway Boulevard to <br />the south to the Bald Eagle Industrial Park and easements acquisitions will be required. <br /> <br />Although a phasing plans has not been provided, the developer has indicted that the apartments <br />would be the first phase of the development. The applicant has indicated that the access to the <br />apartments would be constructed. The roundabout should be constructed with the first phase of <br />the development. The parking for the apartments and the amenities should be constructed with <br />the first phase. It’s unclear in the plan how and when the other streets would be constructed. <br /> <br />A traffic study will likely be required for the development to determine the road phasing and <br />required traffic improvements. <br /> <br />Stormwater Management/Water Reuse <br /> <br />The plan is not showing how stormwater management would be handled. The applicant has <br />indicated that regional stormwater management for the site, instead of individual stormwater <br />management for each site as it develops. This will allow for efficient use of property and is <br />encouraged for the properties. Staff has not evaluated if the stormwater management, but is <br />supportive of regional stormwater management. <br /> <br />Conditions for stormwater reuse for the site is ideal and should be incorporated into the <br />development. Stormwater reuse can aid in meeting the stormwater management requirements for <br />the development. The applicant has not indicated if stormwater reuse would be incorporated into <br />the development. <br /> <br />Utilities <br /> <br />Sewer and water is available to the site in several locations. The applicant should work with the <br />City Engineer on the connection locations and watermain loops. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.