Laserfiche WebLink
Harvieux Minor Subdivision <br /> <br /> <br />B. Consistency with Ordinance Standards <br /> <br />Minor Subdivision Request <br /> <br />Lot Size <br /> <br />The Agricultural zoning district requires a minimum lot size of 10 acres with a 300-foot minimum <br />width and a minimum depth of 480 feet. The two proposed lots will meet these requirements. <br /> <br />Utilities <br /> <br />The property is currently outside of the Metropolitan Urban Service Area (MUSA), which means <br />the property is not eligible to receive City sewer and water. Services are not currently available to <br />the site or planned for the site in the future. <br /> <br />Any parcel proposed to be future home sites and would need a new well and septic system. The <br />applicant has submitted a soil test indicating that there is sufficient space on the new parcel s that <br />is suitable for a septic system on both proposed parcels. The locations have been approved by <br />Washington County. <br /> <br />Grading and Wetlands <br /> <br />A grading plan will have to be submitted to the City prior to the issuance of a building permit for <br />the proposed lot. The applicant shall demonstrate the building sites will comply with the City’s <br />regulations regarding building elevation related to groundwater. A permit will need to be obtained <br />from the City for the location of the new driveway. <br /> <br />Prior to the issuance of any building permit the applicant shall demonstrate that the proposed home <br />and buildings will not impact any wetlands. <br /> <br />Stormwater management <br /> <br />Prior to the issuance of any building permits the applicant shall demonstrate that the proposed <br />parcels meet the Rice Creek Watershed District Rules regarding stormwater management and <br />erosion control. <br /> <br />Streets <br /> <br />The proposed parcels have access to Jody Avenue North, an existing County State-Aid Highway. <br />At the time of application for a building permit, the applicant shall apply for a driveway permit as <br />well as obtain necessary access permits from Washington County. <br /> <br />Sidewalks/Trails <br /> <br />There is a proposed trail in the 2040 Comprehensive Plan along Jody Avenue North. Prior to the <br />issuance of any building permit, the applicant will need to demonstrate that the proposed trail <br />will not be impacted.