My WebLink
|
Help
|
About
|
Sign Out
Home
EDA Packet 09.20.22
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2022 EDA Packets
>
EDA Packet 09.20.22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 2:11:06 PM
Creation date
3/26/2024 2:05:58 PM
Metadata
Fields
Template:
Commissions
Meeting Date
9/20/2022
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Metropolitan District, Waters Edge Building, 1500 County Road B2 West, Roseville, MN 55113 <br /> <br />Questions on this comment should be directed to Joseph Bruer, MnDOT Metro Signs & Markings, <br />joseph.bruer@state.mn.us, or 651-234-7837. <br /> <br />Water Resources: <br />There is not enough information with this submittal to make a firm determination on whether a <br />drainage permit will be required. Any projects adjacent to MnDOT Right-of-Way or connecting to <br />MnDOT drainage facilities will require a MnDOT drainage permit to ensure that current drainage <br />rates to MnDOT right-of-way will not be increased. The drainage permit application, including the <br />information below, should be submitted online to: https://dotapp7.dot.state.mn.us/OLPA/ <br /> <br />The following information must be submitted with the drainage permit application: <br /> <br />1) A grading plan showing existing and proposed contours. <br />2) Drainage area maps for the proposed project showing existing and proposed drainage <br />areas. Any off-site areas that drain to the project area should also be included in the <br />drainage area maps. The direction of flow for each drainage area must be indicated by <br />arrows. <br />3) Drainage computations for pre and post construction conditions during the 2, 10, 50 and 100 <br />year rain events. <br />4) Time of concentration calculations. <br />5) An electronic copy of any computer modeling used for the drainage computations. <br />6) See also the attached Drainage Permits Checklist for more information. <br /> <br />Once a drainage permit application is submitted, a thorough review will be completed and <br />additional information may be requested. <br /> <br />Please direct questions concerning drainage issues to Jason Swenson, MnDOT Metro Water <br />Resources at (651-234-7539) or Jason.Swenson@state.mn.us. <br /> <br />Permits: <br />An Access permit will be required. As stated above, a Drainage permit may be required once <br />additional information is provided to Water Resources. In addition, any use of, or work within or <br />affecting, MnDOT right of way will require a permit. <br /> <br />Permits can be applied for at this site: https://olpa.dot.state.mn.us/OLPA/. Please upload a copy of <br />this letter when applying for any permits. <br /> <br />Please direct questions regarding permit requirements to Buck Craig of MnDOT’s Metro Permits <br />Section at 651-775-0405 or Buck.Craig@state.mn.us. <br /> <br />Review Submittal Options <br />MnDOT’s goal is to complete reviews within 30 calendar days. Review materials received <br />electronically can be processed more rapidly. Do not submit files via a cloud service or SharePoint <br />link. In order of preference, review materials may be submitted as: <br />
The URL can be used to link to this page
Your browser does not support the video tag.