My WebLink
|
Help
|
About
|
Sign Out
Home
2024.05.06 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.05.06 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 10:54:21 AM
Creation date
5/20/2024 3:37:31 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/6/2024
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> <br /> <br />Site Grading Map <br /> <br /> <br /> <br />Fig. E. <br />Grading is limited to the northern side of the array. <br />No grading is planned inside wetlands or lowlands. <br /> <br />Site Preparation <br />1. Inspection of the project area to assess site conditions. Mow site and treat brushy areas <br />with appropriate herbicide, as needed. Care should be taken to avoid compaction and <br />rutting issues throughout the site. <br /> <br />2. Two vegetation herbicide applications will be completed using glyphosate (Round-up® <br />or equivalent) as per manufacturer’s directions in areas with actively growing vegetation. <br />Allow a minimum of 10 days before disturbing the soil or completing seeding activities. <br /> <br />3. Allow the site to regrow and produce leaf mass prior to the second herbicide treatment. <br /> <br />4. When perennial broadleaf vegetation is present a triclopyr herbicide will be added <br />(Garlon 3A® or equivalent) as per manufacturer’s directions. When a broadleaf <br />herbicide is used allow a minimum of 30 days before disturbing the site or completing <br />seeding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.