My WebLink
|
Help
|
About
|
Sign Out
Home
2024.05.06 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.05.06 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2024 10:54:21 AM
Creation date
5/20/2024 3:37:31 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/6/2024
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
220
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EESolar 13,LLC Decommissioning Plan <br />Enterprise Energy,LLC <br />2925 Dean Parkway,Executive Ste 300 <br />Minneapolis,MN 55416 <br />(612)470-7152 <br />DECOMMISSIONING PLAN <br />The Solar Garden consists of many recyclable materials,including glass,semiconductor <br />material,steel,aluminum,copper,and plastics.When the Solar Garden reaches the end of its <br />operational life,the component parts will be dismantled and recycled as described below.We <br />have a lease contract with the property owner,which requires us to decommission and restore <br />the site at our expense.The decommissioning plan would commence at the end of the lease <br />term or in the event of twelve (12)months of non-operation.At the time of decommissioning, <br />the Solar Garden components will be dismantled and removed using minimal impact <br />construction equipment,and materials will be safely recycled or disposed of.EESolar 13,LLC <br />will be responsible for all the decommissioning costs. <br />REMOVAL PROCESS <br />The decommissioning of the Solar Garden proceeds in the following reverse order of the <br />installation: <br />1.The solar system will be disconnected from the utility power grid <br />2.PV modules will be disconnected and removed <br />3.Electrical cables will be removed and recycled off-site <br />4.PV module racking will be removed and recycled off-site <br />5.PV module support posts will be removed and recycled off-site <br />6.Electrical devices,including transformers and inverters,will be removed and recycled off-site <br />7.Concrete pads will be removed and recycled off-site <br />8.Fencing will be removed and recycled off-site <br />9.Reclaim soils in the access driveway and equipment pad areas by removing imported <br />aggregate material and concrete foundations;replace with soils as needed <br />The Solar Garden site may be converted to other uses in accordance with applicable land use <br />regulations at the time of decommissioning.There are no permanent changes to the site,and it <br />will be returned in terrific condition.This is one of the many great things about community solar <br />gardens.If desired,the site.can return to productive farmland after the system is removed.
The URL can be used to link to this page
Your browser does not support the video tag.