Laserfiche WebLink
OHWO <br />H <br />W <br />OHW <br />OH <br />W <br />OHWOHW OHWOHWOHW2626 <br />15 OHWO <br />H <br />W <br />OHW <br />OH <br />W <br />OHWOHW OHWOHWOHW2626 <br />15 <br />49 <br />507 <br />49B <br />155B <br />507 <br />49 <br />120 <br />120 <br />49 <br />454C <br />120 <br />456 <br />507 <br />454F <br />W <br />1040 <br />49 <br />49B <br />49B <br />49 <br />507 <br />49B <br />155B <br />507 <br />49 <br />120 <br />120 <br />49 <br />454C <br />120 <br />456 <br />507 <br />454F <br />W <br />1040 <br />49 <br />49B <br />49B <br />49 <br />507 <br />49B <br />155B <br />507 <br />49 <br />120 <br />120 <br />49 <br />454C <br />120 <br />456 <br />507 <br />454F <br />W <br />1040 <br />49 <br />49B <br />49B <br />A <br />A <br />A <br />B <br />B <br />C <br />C <br />DO NOT DISTURB <br />EXISTING NATIVE <br />AREA <br />A <br />AA <br />A <br />A <br />A <br />0.25 <br />%1.28%2.10%3.65%8.51%12.51 <br />% <br />0.41% <br />1.68%3.97% <br />3.03%2.09%1.96 <br />% <br />3.05 <br />%4.65%1.02% <br />2.20%3.00%1.93%20.36%23.92%17.05%20.86%2.65%0.75%0.73% <br />1.93%2.15%USE PERMANENT BMP AS <br />TEMPORARY SEDIMENTATION <br />BASIN. CONTRACTOR TO REMOVE <br />SEDIMENTATION FROM BMP ONCE <br />SITE HAS BEEN FULLY STABILIZED. <br />APPROXIMATE <br />WETLAND SETBACK <br />APPROXIMATE <br />WETLAND LIMITS <br />APPROXIMATE <br />WETLAND LIMITS <br />ISSUES & REVISIONS <br />COMMISSION NO: <br />DRAWN BY: <br />CHECKED BY: <br />SHEET <br />767 N. EUSTIS STREET, SUITE 190 <br />ST. PAUL, MINNESOTA 55114 <br />651.642.9200 <br />WWW.POPEDESIGN.COM <br />POPE DESIGN GROUP <br />DATE <br />160061004 <br />GAR <br />MCB <br />MICHAEL C. BRANDT, P.E. <br />03/29/2024 462661DATE: <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION OR REPORT WAS PREPARED BY <br />ME OR UNDER MY DIRECT SUPERVISION AND <br />THAT I AM A DULY LICENSED PROFESSIONAL <br />ENGINEER UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />MN <br />LIC. NO. <br />NOT FOR CONSTRUCTION <br />SCHEMATIC PRICING4-14-23 <br />1 CITY SUBMITTAL11-30-23 <br /> © 2023 KIMLEY-HORN AND ASSOCIATES, INC. <br />767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 <br />PHONE: 651-645-4197 <br />WWW.KIMLEY-HORN.COM <br />PRELIMINARY - NOT FOR CONSTRUCTIONCITY & BCWD <br />RESUBMITTAL 03-29-24 <br />NORTH <br />1.INSTALL PERIMETER EROSION CONTROL (I.E. SILT FENCE) AND INLET PROTECTION AT <br />EXISTING STORMWATER INLETS. <br />2.CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE AND CONCRETE WASHOUT <br />3.PREPARE TEMPORARY PARKING AND STORAGE AREA. <br />4.CONSTRUCT AND STABILIZE DIVERSIONS AND TEMPORARY SEDIMENT BASINS. <br />5.CLEAR AND GRUB THE SITE. <br />6.BEGIN MASS SITE GRADING AND ROUGH GRADE SITE SUFFICIENTLY TO ESTABLISH <br />PROPOSED DRAINAGE PATTERNS. <br />7.START CONSTRUCTION OF THE BUILDING PAD AND STRUCTURES. <br />8.TEMPORARILY SEED, THROUGHOUT CONSTRUCTION, DISTURBED AREAS THAT WILL BE <br />INACTIVE FOR 7 DAYS OR MORE OR AS REQUIRED BY THE NPDES AND/OR CITY GRADING <br />PERMIT(S). <br />NOTE: THE SEQUENCE OF CONSTRUCTION IS INTENDED TO CONVEY THE GENERAL CONCEPTS <br />OF THE EROSION CONTROL DESIGN AND SHOULD NOT BE RELIED UPON FOR CONSTRUCTION <br />PURPOSES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETAILED PHASING AND <br />CONSTRUCTION SEQUENCING NECESSARY TO CONSTRUCT THE PROPOSED IMPROVEMENTS. <br />THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING IMMEDIATELY, PRIOR TO AND/OR <br />DURING CONSTRUCTION IF ANY ADDITIONAL INFORMATION ON THE CONSTRUCTION SEQUENCE <br />IS NECESSARY. <br />PHASE 1 SEQUENCE OF CONSTRUCTION <br />ROCK ENTRANCE <br />INLET PROTECTION <br />SILT FENCE <br />LIMITS OF DISTURBANCE <br />SAFETY FENCE <br />BIOROLL <br />LEGEND <br />EROSION CONTROL BLANKET <br />Know what'sbelow. <br />before you dig.Call <br />1.THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS <br />COMPRISED OF THE EROSION CONTROL PLAN, THE STANDARD <br />DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN THE <br />SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL <br />SUBSEQUENT REPORTS AND RELATED DOCUMENTS. <br />2.ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH LAND <br />DISTURBING ACTIVITIES SHALL OBTAIN A COPY OF THE SWPPP AND <br />NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) <br />GENERAL PERMIT, AND BECOME FAMILIAR WITH THEIR CONTENTS. <br />3.BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL <br />CONFORM TO FEDERAL, STATE AND LOCAL REQUIREMENTS, AS <br />APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL <br />CONTROLS AS DIRECTED BY THE PERMITTING AGENCY, ENGINEER <br />OR OWNER. <br />4.SITE ENTRY AND EXIT LOCATIONS SHALL BE MAINTAINED IN A <br />CONDITION THAT WILL PREVENT THE TRACKING OR FLOWING OF <br />SEDIMENT ONTO PUBLIC ROADWAYS. SEDIMENT SPILLED, DROPPED, <br />WASHED, OR TRACKED ONTO A PUBLIC ROADWAY FROM THE <br />CONSTRUCTION SITE MUST BE REMOVED AS SOON AS PRACTICABLE. <br />WHEN WASHING IS REQUIRED TO REMOVE SEDIMENT PRIOR TO <br />ENTRANCE ONTO A PUBLIC ROADWAY, IT SHALL BE DONE IN AN <br />AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN <br />APPROVED SEDIMENT BASIN. ANY FINES IMPOSED FOR <br />DISCHARGING SEDIMENT ONTO A PUBLIC RIGHT OF WAY SHALL BE <br />PAID BY THE CONTRACTOR. <br />5.TEMPORARY SEEDING OR OTHER APPROVED METHODS OF <br />STABILIZATION SHALL BE INITIATED WITHIN 7 DAYS OF THE LAST <br />DISTURBANCE ON ANY AREA OF THE SITE. <br />6.THE CONTRACTOR SHALL MINIMIZE LAND DISTURBANCE AND <br />CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED <br />BY THE GENERAL PERMIT. <br />7.CONTRACTOR SHALL DENOTE ON THE PLAN THE TEMPORARY <br />PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE <br />EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE <br />PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, <br />OFFICE TRAILERS, AND TOILET FACILITIES. <br />8.ALL WASH WATER FROM THE CONSTRUCTION SITE (CONCRETE <br />TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE <br />DETAINED AND PROPERLY TREATED BEFORE DISPOSAL. <br />9.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND <br />FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY <br />AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS <br />AND LEAKS. <br />10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON <br />SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR <br />TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS <br />PROHIBITED. <br />11.RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS <br />SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL <br />BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE <br />ACTION OF WIND OR STORM WATER DISCHARGE INTO DRAINAGE <br />DITCHES OR WATERS OF THE STATE. <br />12.STAGING AREAS, STOCKPILES, SPOILS, ETC. SHALL BE LOCATED <br />OUTSIDE OF DRAINAGE WAYS SUCH THAT STORM WATER RUNOFF <br />WILL NOT BE ADVERSELY AFFECTED. PROVIDE STABILIZATION <br />MEASURES SUCH AS PERIMETER EROSION CONTROL BMP'S, <br />SEEDING, OR OTHER COVERING AS NECESSARY TO PREVENT <br />EROSION. <br />13.CONTRACTOR SHALL BE RESPONSIBLE FOR RE-ESTABLISHING ANY <br />EROSION CONTROL BMP DISTURBED DURING CONSTRUCTION <br />OPERATIONS. NOTIFY THE OWNER'S REPRESENTATIVE OF ANY <br />DEFICIENCIES IN THE ESTABLISHED EROSION CONTROL MEASURES <br />THAT MAY LEAD TO UNAUTHORIZED DISCHARGE OF STORM WATER <br />POLLUTANTS. UNAUTHORIZED POLLUTANTS INCLUDE (BUT ARE NOT <br />LIMITED TO) EXCESS CONCRETE DUMPING, CONCRETE RESIDUE, <br />PAINTS, SOLVENTS, GREASES, FUELS, LUBRICANT OILS, PESTICIDES, <br />AND SOLID WASTE MATERIALS. <br />14.EROSION CONTROL BMP'S SHOWN ON THESE PLANS SHALL BE <br />INSTALLED PRIOR TO THE START OF LAND-DISTURBING ACTIVITIES <br />ON THE PROJECT, AND INITIATED AS SOON AS PRACTICABLE. <br />15.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR COMPLYING WITH <br />THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION, <br />AND SHALL MAINTAIN COMPLIANCE WITH APPLICABLE LAWS AND <br />REGULATIONS FOR THE DURATION OF CONSTRUCTION. <br />16.THE CONTRACTOR SHALL FIELD ADJUST AND/OR PROVIDE <br />ADDITIONAL EROSION CONTROL BMP'S AS NEEDED TO PREVENT <br />EROSION AND OFF-SITE SEDIMENT DISCHARGE FROM THE <br />CONSTRUCTION SITE. LOG AND RECORD ANY ADJUSTMENTS AND <br />DEVIATIONS FROM THE APPROVED EROSION CONTROL PLANS <br />WITHIN THE SWPPP DOCUMENTS STORED IN THE JOB SITE TRAILER. <br />EROSION CONTROL PLAN NOTES <br />PHASE I BMP QUANTITIES <br />SILT FENCE ±6,675 LF <br />INLET PROTECTION 3 EA <br />ROCK CONSTRUCTION ENTRANCE 2 EA <br />THE CONTRACTOR MUST UPDATE THE SWPPP BY NOTING ON THE SITE MAPS <br />IN THE JOB SITE BINDER TO REFLECT THE PROGRESS OF CONSTRUCTION <br />ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE FOR THE <br />DURATION OF LAND DISTURBING ACTIVITIES. AT A MINIMUM, UPDATES SHALL <br />BE MADE DAILY TO TRACK CONSTRUCTION PROGRESS DESCRIBED IN THE <br />SEQUENCE OF CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR <br />NOTING THE LOCATION OF THE JOB SITE TRAILER, TEMPORARY PARKING & <br />LAYDOWN AREAS, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, FUEL <br />& MATERIAL STORAGE, SOLID WASTE CONTAINERS, AND OTHER <br />CONSTRUCTION RELATED FACILITIES THAT MAY IMPACT STORMWATER <br />RUNOFF. <br />SWPPP UPDATES & AMENDMENTS <br />KEYNOTE LEGEND <br />SILT FENCE <br />INLET PROTECTION <br />ROCK CONSTRUCTION ENTRANCE <br />A <br />B <br />C <br />C300 <br />EROSION AND SEDIMENT <br />CONTROL PLAN - PHASE 1 <br />SOIL BOUNDARY - PER NRCS <br />XXX SOIL TYPE - PER NRCS <br />SOIL MAP LEGEND <br />MAP UNIT SYMBOL MAP UNIT NAME ACRES IN AOI PERCENT OF AOI <br />49 ANTIGO SILT LOAM, 0 TO 2% <br />SLOPES 60.1 56.05% <br />49B ANTIGO SILT LOAM, 2 TO 6% <br />SLOPES 6.6 6.2% <br />120 BRILL SILT LOAM 11.8 11.1% <br />155B CHETEK SANDY LOAM, 1 TO <br />6% SLOPES 1.4 1.40% <br />454C MAHTOMEDI LOAMY SAND, 6 <br />TO 12% SLOPES 0.6 .5% <br />456 BARRONETT SILT LOAM, 0 TO <br />2% SLOPES 2.7 2.6% <br />507 POSKIN SILT LOAM 18.1 17% <br />W WATER 0.1 .1% <br />TOTAL FOR AREA OF INTEREST 106.5 100%