Laserfiche WebLink
49 <br />507 <br />49B <br />155B <br />507 <br />49 <br />120 <br />120 <br />49 <br />454C <br />120 <br />456 <br />507 <br />454F <br />W <br />1040 <br />49 <br />49B <br />49B <br />970 <br />9 <br />7 <br />0 <br />975 <br />9 <br />7 <br />5 <br />9 <br />8 <br />0 <br />980985985 <br />9 <br />8 <br />59859 <br />9 <br />0 <br />9 <br />9 <br />0 <br />986 <br />9 <br />8 <br />6 <br />9 <br />8 <br />7 <br />987 <br />9 <br />8 <br />7 <br />A <br />A <br />A <br />B <br />C <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />D <br />B <br />B <br />B <br />986 <br />986 <br />985 <br />98 <br />5 <br />9 <br />8 <br />6 <br />986 <br />9 <br />7 <br />9980981982983 98598599 <br />0 99099099098498498698698798798 <br />8 <br />988 <br />98898898 <br />9 98998999 <br />0 <br />995 995988 <br />98 <br />9 <br />99 <br />1 <br />9 <br />9 <br />1 <br />9 <br />9 <br />1 <br />9 <br />9 <br />2 <br />9 <br />9 <br />2 <br />9 <br />9 <br />2 <br />99 <br />3 9939 <br />9 <br />3 <br />9 <br />9 <br />4 994A <br />A <br />A <br />A <br />A <br />A <br />USE PERMANENT BMP AS <br />TEMPORARY SEDIMENTATION <br />BASIN. CONTRACTOR TO REMOVE <br />SEDIMENTATION FROM BMP ONCE <br />SITE HAS BEEN FULLY STABILIZED. <br />C <br />B <br />BB <br />B <br />B <br />B B <br />B <br />B <br />B <br />BB <br />B <br />B <br />B <br />B B <br />B <br />B <br />B <br />B <br />B <br />B <br />B <br />BB <br />B <br />B <br />B <br />B <br />B BB <br />B <br />ISSUES & REVISIONS <br />COMMISSION NO: <br />DRAWN BY: <br />CHECKED BY: <br />SHEET <br />767 N. EUSTIS STREET, SUITE 190 <br />ST. PAUL, MINNESOTA 55114 <br />651.642.9200 <br />WWW.POPEDESIGN.COM <br />POPE DESIGN GROUP <br />DATE <br />160061004 <br />GAR <br />MCB <br />MICHAEL C. BRANDT, P.E. <br />03/29/2024 462661DATE: <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION OR REPORT WAS PREPARED BY <br />ME OR UNDER MY DIRECT SUPERVISION AND <br />THAT I AM A DULY LICENSED PROFESSIONAL <br />ENGINEER UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />MN <br />LIC. NO. <br />NOT FOR CONSTRUCTION <br />SCHEMATIC PRICING4-14-23 <br />1 CITY SUBMITTAL11-30-23 <br /> © 2023 KIMLEY-HORN AND ASSOCIATES, INC. <br />767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 <br />PHONE: 651-645-4197 <br />WWW.KIMLEY-HORN.COM <br />PRELIMINARY - NOT FOR CONSTRUCTIONCITY & BCWD <br />RESUBMITTAL 03-29-24 <br />NORTH <br />PHASE 2 SEQUENCE OF CONSTRUCTION <br />ROCK ENTRANCE <br />INLET PROTECTION <br />SILT FENCE <br />LIMITS OF DISTURBANCE <br />SAFETY FENCE <br />BIOROLL <br />LEGEND <br />EROSION CONTROL BLANKET <br />Know what'sbelow. <br />before you dig.Call <br />1.THE STORM WATER POLLUTION PREVENTION PLAN ("SWPPP") IS <br />COMPRISED OF THE EROSION CONTROL PLAN, THE STANDARD <br />DETAILS, THE PLAN NARRATIVE, ATTACHMENTS INCLUDED IN THE <br />SPECIFICATIONS OF THE SWPPP, PLUS THE PERMIT AND ALL <br />SUBSEQUENT REPORTS AND RELATED DOCUMENTS. <br />2.ALL CONTRACTORS AND SUBCONTRACTORS INVOLVED WITH LAND <br />DISTURBING ACTIVITIES SHALL OBTAIN A COPY OF THE SWPPP AND <br />NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) <br />GENERAL PERMIT, AND BECOME FAMILIAR WITH THEIR CONTENTS. <br />3.BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL <br />CONFORM TO FEDERAL, STATE AND LOCAL REQUIREMENTS, AS <br />APPLICABLE. THE CONTRACTOR SHALL IMPLEMENT ADDITIONAL <br />CONTROLS AS DIRECTED BY THE PERMITTING AGENCY, ENGINEER <br />OR OWNER. <br />4.SITE ENTRY AND EXIT LOCATIONS SHALL BE MAINTAINED IN A <br />CONDITION THAT WILL PREVENT THE TRACKING OR FLOWING OF <br />SEDIMENT ONTO PUBLIC ROADWAYS. SEDIMENT SPILLED, DROPPED, <br />WASHED, OR TRACKED ONTO A PUBLIC ROADWAY FROM THE <br />CONSTRUCTION SITE MUST BE REMOVED AS SOON AS PRACTICABLE. <br />WHEN WASHING IS REQUIRED TO REMOVE SEDIMENT PRIOR TO <br />ENTRANCE ONTO A PUBLIC ROADWAY, IT SHALL BE DONE IN AN <br />AREA STABILIZED WITH CRUSHED STONE WHICH DRAINS INTO AN <br />APPROVED SEDIMENT BASIN. ANY FINES IMPOSED FOR <br />DISCHARGING SEDIMENT ONTO A PUBLIC RIGHT OF WAY SHALL BE <br />PAID BY THE CONTRACTOR. <br />5.TEMPORARY SEEDING OR OTHER APPROVED METHODS OF <br />STABILIZATION SHALL BE INITIATED WITHIN 7 DAYS OF THE LAST <br />DISTURBANCE ON ANY AREA OF THE SITE. <br />6.THE CONTRACTOR SHALL MINIMIZE LAND DISTURBANCE AND <br />CLEARING TO THE MAXIMUM EXTENT PRACTICAL OR AS REQUIRED <br />BY THE GENERAL PERMIT. <br />7.CONTRACTOR SHALL DENOTE ON THE PLAN THE TEMPORARY <br />PARKING AND STORAGE AREA WHICH SHALL ALSO BE USED AS THE <br />EQUIPMENT MAINTENANCE AND CLEANING AREA, EMPLOYEE <br />PARKING AREA, AND AREA FOR LOCATING PORTABLE FACILITIES, <br />OFFICE TRAILERS, AND TOILET FACILITIES. <br />8.ALL WASH WATER FROM THE CONSTRUCTION SITE (CONCRETE <br />TRUCKS, VEHICLE CLEANING, EQUIPMENT CLEANING, ETC.) SHALL BE <br />DETAINED AND PROPERLY TREATED BEFORE DISPOSAL. <br />9.SUFFICIENT OIL AND GREASE ABSORBING MATERIALS AND <br />FLOTATION BOOMS SHALL BE MAINTAINED ON SITE OR READILY <br />AVAILABLE TO CONTAIN AND CLEAN-UP FUEL OR CHEMICAL SPILLS <br />AND LEAKS. <br />10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL ON <br />SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR <br />TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS <br />PROHIBITED. <br />11.RUBBISH, TRASH, GARBAGE, LITTER, OR OTHER SUCH MATERIALS <br />SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL <br />BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE <br />ACTION OF WIND OR STORM WATER DISCHARGE INTO DRAINAGE <br />DITCHES OR WATERS OF THE STATE. <br />12.STAGING AREAS, STOCKPILES, SPOILS, ETC. SHALL BE LOCATED <br />OUTSIDE OF DRAINAGE WAYS SUCH THAT STORM WATER RUNOFF <br />WILL NOT BE ADVERSELY AFFECTED. PROVIDE STABILIZATION <br />MEASURES SUCH AS PERIMETER EROSION CONTROL BMP'S, <br />SEEDING, OR OTHER COVERING AS NECESSARY TO PREVENT <br />EROSION. <br />13.CONTRACTOR SHALL BE RESPONSIBLE FOR RE-ESTABLISHING ANY <br />EROSION CONTROL BMP DISTURBED DURING CONSTRUCTION <br />OPERATIONS. NOTIFY THE OWNER'S REPRESENTATIVE OF ANY <br />DEFICIENCIES IN THE ESTABLISHED EROSION CONTROL MEASURES <br />THAT MAY LEAD TO UNAUTHORIZED DISCHARGE OF STORM WATER <br />POLLUTANTS. UNAUTHORIZED POLLUTANTS INCLUDE (BUT ARE NOT <br />LIMITED TO) EXCESS CONCRETE DUMPING, CONCRETE RESIDUE, <br />PAINTS, SOLVENTS, GREASES, FUELS, LUBRICANT OILS, PESTICIDES, <br />AND SOLID WASTE MATERIALS. <br />14.EROSION CONTROL BMP'S SHOWN ON THESE PLANS SHALL BE <br />INSTALLED PRIOR TO THE START OF LAND-DISTURBING ACTIVITIES <br />ON THE PROJECT, AND INITIATED AS SOON AS PRACTICABLE. <br />15.THE CONTRACTOR IS SOLELY RESPONSIBLE FOR COMPLYING WITH <br />THE REQUIREMENTS OF THE AUTHORITIES HAVING JURISDICTION, <br />AND SHALL MAINTAIN COMPLIANCE WITH APPLICABLE LAWS AND <br />REGULATIONS FOR THE DURATION OF CONSTRUCTION. <br />16.THE CONTRACTOR SHALL FIELD ADJUST AND/OR PROVIDE <br />ADDITIONAL EROSION CONTROL BMP'S AS NEEDED TO PREVENT <br />EROSION AND OFF-SITE SEDIMENT DISCHARGE FROM THE <br />CONSTRUCTION SITE. LOG AND RECORD ANY ADJUSTMENTS AND <br />DEVIATIONS FROM THE APPROVED EROSION CONTROL PLANS <br />WITHIN THE SWPPP DOCUMENTS STORED IN THE JOB SITE TRAILER. <br />EROSION CONTROL PLAN NOTES <br />PHASE II BMP QUANTITIES <br />SILT FENCE ±6,700 LF <br />INLET PROTECTION 65 EA <br />ROCK CONSTRUCTION ENTRANCE 2 EA <br />BIOROLL ±1,800 LF <br />THE CONTRACTOR MUST UPDATE THE SWPPP BY NOTING ON THE SITE <br />MAPS IN THE JOB SITE BINDER TO REFLECT THE PROGRESS OF <br />CONSTRUCTION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT <br />SITE FOR THE DURATION OF LAND DISTURBING ACTIVITIES. AT A MINIMUM, <br />UPDATES SHALL BE MADE DAILY TO TRACK CONSTRUCTION PROGRESS <br />DESCRIBED IN THE SEQUENCE OF CONSTRUCTION. THE CONTRACTOR IS <br />RESPONSIBLE FOR NOTING THE LOCATION OF THE JOB SITE TRAILER, <br />TEMPORARY PARKING & LAYDOWN AREAS, PORTA-POTTY, WHEEL WASH, <br />CONCRETE WASHOUT, FUEL & MATERIAL STORAGE, SOLID WASTE <br />CONTAINERS, AND OTHER CONSTRUCTION RELATED FACILITIES THAT <br />MAY IMPACT STORMWATER RUNOFF. <br />SWPPP UPDATES & AMENDMENTS <br />KEYNOTE LEGEND <br />SILT FENCE <br />INLET PROTECTION <br />ROCK CONSTRUCTION ENTRANCE <br />BIOROLL <br />A <br />B <br />C <br />D <br />C301 <br />EROSION AND SEDIMENT <br />CONTROL PLAN - PHASE 2 <br />1.TEMPORARILY SEED, THROUGHOUT CONSTRUCTION, DENUDED AREAS THAT WILL BE <br />INACTIVE FOR 7 DAYS OR MORE. <br />2.CONSTRUCT UNDERGROUND SITE UTILITIES AND STORM SEWER, INCLUDING <br />UNDERGROUND STORMWATER MANAGEMENT SYSTEM. <br />3.INSTALL APPROPRIATE INLET PROTECTION AT ANY NEW STORM SEWER STRUCTURES <br />AS EACH STRUCTURE IS CONSTRUCTED. <br />4.COMPLETE SITE GRADING AND PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS <br />THEY ARE BROUGHT TO FINAL GRADE. <br />5.PLACE PAVEMENT BASE MATERIAL AND INSTALL SUBDRAINAGE SYSTEM. <br />6.CONSTRUCT PAVEMENTS, CURB & GUTTER, AND SIDEWALKS. <br />7.AS APPROPRIATE, REPLACE & MAINTAIN INLET PROTECTION DEVICES WITHIN PAVED <br />AREAS AS WORK PROGRESSES. <br />8.COMPLETE FINAL GRADING AND INSTALL OF PERMANENT STABILIZATION (SEEDING, <br />SODDING, ETC.) WITHIN LANDSCAPED AREAS. <br />9.WHEN THE SITE HAS ACHIEVED FINAL STABILIZATION AS DEFINED BY THE APPLICABLE <br />EROSION CONTROL PERMITS, REMOVE ALL REMAINING TEMPORARY EROSION & <br />SEDIMENT CONTROL BMP'S AND RE-STABILIZE ANY AREAS DISTURBED BY THE REMOVAL. <br />NOTE: THE SEQUENCE OF CONSTRUCTION IS INTENDED TO CONVEY THE GENERAL CONCEPTS <br />OF THE EROSION CONTROL DESIGN AND SHOULD NOT BE RELIED UPON FOR CONSTRUCTION <br />PURPOSES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DETAILED PHASING AND <br />CONSTRUCTION SEQUENCING NECESSARY TO CONSTRUCT THE PROPOSED IMPROVEMENTS. <br />THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING IMMEDIATELY, PRIOR TO AND/OR <br />DURING CONSTRUCTION IF ANY ADDITIONAL INFORMATION ON THE CONSTRUCTION SEQUENCE <br />IS NECESSARY. <br />SOIL MAP LEGEND <br />MAP UNIT SYMBOL MAP UNIT NAME ACRES IN AOI PERCENT OF AOI <br />49 ANTIGO SILT LOAM, 0 TO 2% <br />SLOPES 60.1 56.05% <br />49B ANTIGO SILT LOAM, 2 TO 6% <br />SLOPES 6.6 6.2% <br />120 BRILL SILT LOAM 11.8 11.1% <br />155B CHETEK SANDY LOAM, 1 TO <br />6% SLOPES 1.4 1.40% <br />454C MAHTOMEDI LOAMY SAND, 6 <br />TO 12% SLOPES 0.6 .5% <br />456 BARRONETT SILT LOAM, 0 TO <br />2% SLOPES 2.7 2.6% <br />507 POSKIN SILT LOAM 18.1 17% <br />W WATER 0.1 .1% <br />TOTAL FOR AREA OF INTEREST 106.5 100% <br />SOIL BOUNDARY - PER NRCS <br />XXX SOIL TYPE - PER NRCS