My WebLink
|
Help
|
About
|
Sign Out
Home
2024.06.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2024 CC Packet
>
2024.06.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2024 3:49:14 PM
Creation date
6/14/2024 10:05:22 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/3/2024
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 <br />2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 2" SCH 80 2" SCH 802" SCH 80 2" SCH 80 <br />NORMAL WATER LEVEL: 973.00 <br />100-YR HWL: 978.30 <br />EOF: 980.00 <br />WATER QUALITY VOLUME: 701,969 CF <br />TOTAL STORAGE VOLUME: 2,237,154 CF <br />LOWER SCHOOL <br />±33,590 SF <br />EXISTING LOWER <br />SCHOOL <br />GOGGINS LAKE <br />OHW: 965.5 <br />EXISTING DNR MONITORING WELL <br />BASEBALL FIELD <br />(ALTERNATE) <br />SEPTIC <br />TRACK AND <br />SOCCER/LACROSSE FIELD <br />COMMONS BUILDING <br />±82,200 SF <br />CHAPEL <br />±8,050 SF <br />UPPER SCHOOL <br />±33,440 SF <br />MIDDLE SCHOOL <br />±33,440 SF <br />SEPTICKELLER AVE122ND ST <br />FUTURE SOCCER/LACROSSE <br />PRACTICE FIELD (350X220) <br />UTILITY BUILDING, SEE <br />ARCHITECTURAL PLANS <br />CITY OF HUGO / MAY <br />TOWNSHIP LINE <br />EXISTING FARM HOUSE , <br />BUILDINGS, AND <br />PAVEMENT TO REMAIN <br />Know what'sbelow. <br />before you dig.Call <br />R <br />NORTH <br />LEGEND <br />PROPERTY LINE <br />CONCRETE SIDEWALK <br />STORMWATER BASIN <br />PROPOSED SEPTIC FIELD <br />ISSUES & REVISIONS <br />COMMISSION NO: <br />DRAWN BY: <br />CHECKED BY: <br />SHEET <br />767 N. EUSTIS STREET, SUITE 190 <br />ST. PAUL, MINNESOTA 55114 <br />651.642.9200 <br />WWW.POPEDESIGN.COM <br />POPE DESIGN GROUP <br />DATE <br />160061004 <br />GAR <br />MCB <br />MICHAEL C. BRANDT, P.E. <br />03/29/2024 462661DATE: <br />I HEREBY CERTIFY THAT THIS PLAN, <br />SPECIFICATION OR REPORT WAS PREPARED BY <br />ME OR UNDER MY DIRECT SUPERVISION AND <br />THAT I AM A DULY LICENSED PROFESSIONAL <br />ENGINEER UNDER THE LAWS OF THE STATE OF <br />MINNESOTA. <br />MN <br />LIC. NO. <br />NOT FOR CONSTRUCTION <br />SCHEMATIC PRICING4-14-23 <br />1 CITY SUBMITTAL11-30-23 <br /> © 2023 KIMLEY-HORN AND ASSOCIATES, INC. <br />767 EUSTIS STREET, SUITE 100, ST. PAUL, MN 55114 <br />PHONE: 651-645-4197 <br />WWW.KIMLEY-HORN.COM <br />PRELIMINARY - NOT FOR CONSTRUCTION <br />CITY & BCWD <br />RESUBMITTAL 03-29-24 <br />C400 <br />PHASE I OVERALL SITE <br />PLAN <br />ASPHALT PAVEMENT <br />SITE FENCING <br />GRAVEL PARKING AREA <br />PHASE 1 WORK <br />PHASE I PARKING <br />TOTAL REQUIRED PHASE I PARKING <br />(PER CITY OF HUGO CODE, 1 SPACE PER 100 LOWER <br />SCHOOL STUDENTS + 1 SPACE PER 4 UPPER SCHOOL <br />STUDENTS + 1 SPACE PER CLASSROOM) <br />64 SPACES <br />PROPOSED PHASE I PARKING 202 SPACES <br />PHASE I CAMPUS PROJECTIONS <br />PROJECTED PHASE I STUDENT POPULATION 336 <br />PHASE I LOWER SCHOOL STUDENTS 186 <br />PHASE I MIDDLE SCHOOL STUDENTS 0 <br />PHASE I HIGH SCHOOL STUDENTS 150 <br />PHASE I STAFF COUNT 35 <br />TOTAL NUMBER OF PHASE I CLASSROOMS 24 <br />*Not Part of Approval
The URL can be used to link to this page
Your browser does not support the video tag.