Laserfiche WebLink
Resolution 2024-34 <br /> Page 2 <br /> 9. All SAC and WAC (connection and trunk) fees per the fee schedule shall be paid. <br /> 10. Stormwater trunk fee per the fee schedule shall be paid. <br /> 11. The lighting plan shall be revised based on staffs comments. The lighting plan shall <br /> be reviewed and approved by staff. Decorative lighting shall be added to the walls of <br /> the building. <br /> 12. The developer shall provide cut-sheets for the pole and wall mounted light fixtures <br /> and they will need to be reviewed and approved by staff. Shields shall be added to <br /> the lights to reduce glare. <br /> 13. Cross access agreement shall be reviewed and approved by staff for all common <br /> elements. <br /> 14. The plans shall be revived to include the following, and shall be reviewed and <br /> approved by staff: <br /> Landscaping <br /> 15. The landscape plan shall be revised for review and approval by staff to include the <br /> following: <br /> a. The required amount of landscaping per City Code Section 90-181. <br /> b. Include foundation landscaping behind the garages for the apartments. <br /> c. Screen the trash enclosure on all sides with evergreens. <br /> d. Landscaping shall be added to screen any ground mounted mechanical <br /> equipment. <br /> 16. The developer shall revise the landscape plan to be reviewed and approved by staff. <br /> Architecture <br /> 17. Add cast stone to the elevations to meet the intent of the design guidelines, <br /> specifically the corners and main entrance points. <br /> 18. The internal air conditioning unit vents shown on the plans shall match the color of <br /> the adjacent siding or stone. <br /> 19. The developer shall provide details on the locations and colors of the gutters and <br /> down spouts. <br /> 20. The applicant shall submit building materials for review and approval by staff. <br /> 21. The developer shall revise the architecture plans to be reviewed and approved by <br /> staff. <br />