My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 04.11.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 04.11.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:42:54 PM
Creation date
3/6/2025 11:33:03 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The solar installation will comply with the international building code, including sections <br /> 605.11-605.11.2 regarding the location of underground electrical conduit, the national electric <br /> code, and all local electric and fire codes and ordinances. The solar installation will have <br /> emergency contact information posted on a sign at the fence entrance. The local fire department <br /> will be given an emergency key to the security fence. Solar production will be monitored 24/7 for <br /> electrical and mechanical issues. <br /> Attachments <br /> 1. Site Plan <br /> 2. Wetland Boundary Concurrence <br /> 3. Wetland No-Loss Determination <br /> 4. Plant Survey <br /> 5. Wildlife Species List <br /> 6. Phase I ESA <br /> 7. Phase I Archeological <br /> 8. Title Commitment <br /> 9. ALTA Survey <br /> 10. Stormwater Report <br /> 11. SWPPP <br /> 12. Grading & Erosion Control Plan <br /> 13. Vegetation Management Plan <br /> 14. Decommissioning Plan <br /> 15. Soil Electric Resistivity Test <br /> 9 Enterprise Energy <br /> ENTERPRISE 2925 Dean Parkway, Executive Suite 300 <br /> Ta. ENERGY <br /> Minneapolis, MN 55416 <br /> (952) 212-0824 <br />
The URL can be used to link to this page
Your browser does not support the video tag.