My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 05.09.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 05.09.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:38:16 PM
Creation date
3/6/2025 11:35:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Resolution 2022-32 <br /> Page 2 <br /> Oneka Lake <br /> Required Proposed <br /> Setback from OHW 150 feet Over 150 feet <br /> Minimum Lot Size 20,000 s . ft. 5,417 s . ft. <br /> Minimum Lot Width 125 feet 52 feet <br /> Maximum Structure Height 25 feet 35 feet <br /> Maximum Impervious 25% Less than 25% <br /> Surface Area overall <br /> 6. The preliminary phasing plan is generally approved per plans dated October 21, <br /> 2022, revised May 4, 2022. Any major revisions to the phasing plan shall require <br /> PUD amendment. Minor modifications shall be reviewed and approved by staff. <br /> a. Phase 1 shall include: <br /> i. Permit shall be issued by MnDOT for construction of the <br /> roundabout at 1591h Street and Highway 61. <br /> ii. Start of construction of the roundabout at 159th Street and Highway <br /> 61. <br /> iii. The developer is responsible for the cost and construction of the <br /> roundabout at 1591h Street and Highway 61. The Letter of Credit <br /> for Phase 1 shall include the costs for construction of the <br /> roundabout. <br /> b. Phase 2 shall include: <br /> i. The roundabout at 159th Street and Highway 61 shall be <br /> constructed and functioning, with the first layer of bituminous, <br /> prior to issuance of a building permit for the 1 st building. <br /> ii. Park improvements: <br /> 1. An 8' bituminous trail,boardwalk, and landscaping shall be <br /> installed within all of Outlot G that is in phase 2. Final <br /> location of the trail and boardwalk shall be reviewed and <br /> approved by staff prior to installation. This shall be <br /> constructed by and paid for by the developer. <br /> 2. The trail locations and trail connections to the parks to the <br /> south and the connections to the development shall be <br /> reviewed and approved by staff. <br /> 3. Connections to the parks and development shall be <br /> installed. <br /> c. Phase 3 shall include: <br /> i. Park improvements: <br /> 1. The remaining 8' bituminous trail, boardwalk, and <br /> landscaping shall be installed within all of Outlot G. Final <br /> location of the trail and boardwalk shall be reviewed and <br />
The URL can be used to link to this page
Your browser does not support the video tag.