My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 05.09.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 05.09.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:38:16 PM
Creation date
3/6/2025 11:35:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Liberty Classical Academy: Phase 1—Lower School Addition <br /> 11/30/23—Revised 05/06/24 <br /> Page 2 <br /> Master Plan Phasing: <br /> Phase one will include the addition to the lower school, additional parking with screening to the south,a practice soccer <br /> field (without lights, bleachers or speakers),a portion of the septic system,a stormwater pond,and a new access road from <br /> Keller.The lower school expansion includes eleven classrooms and six specialist/vocational rooms.The existing gym, not <br /> meeting standard regulation sizes,will be renovated into classrooms,while a new varsity size gymnasium will be included in <br /> the addition which will also act as the project's storm shelter and meet ICC-500 code requirements.This phase includes <br /> approximately 33,500 sf of addition and 3,500 sf of renovation. For the purposes of this submittal, it is important to note <br /> that in the first phase,the lower school addition will temporarily house the upper school students,and V-5t"graders will <br /> remain at the White Bear Lake site until future phases are completed.This temporary condition has been taken into <br /> consideration for parking requirements. <br /> Subsequent phases are contingent on fundraising and will include a commons building, Middle School and Upper School <br /> wings,a chapel,a track and field,and a new main entrance drive off of 122"1 to accommodate all queuing. <br /> During preliminary meetings with both the City of Hugo and May Township, it was encouraged to show the full master plan <br /> for an understanding of anticipated future development, however Liberty understands that at this time,we are only <br /> seeking approval of phase one features. <br /> Embracing the Character: <br /> Adhering to the"City of Hugo Commercial and Industrial Design Guidelines"as well as Hugo's"2040 Comprehensive Plan," <br /> the proposed buildings aim to not only meet the design guidelines but also keep within the character of the surrounding <br /> area and help Hugo fulfill their commitment to developing a well-balanced community. <br /> The exterior materials proposed for the lower school addition intend to complement the existing lower school, <br /> incorporating wood-look cladding,warm stone bases,accent metal panels,and earth-tone brick.While an exact match of <br /> existing brick may be challenging,the design opts for complementary materials.The precast will also complement the <br /> existing precast earth tone color as well as the warmer gray existing metal panels. <br /> All facades on the lower school addition will have continued design elements so there is not an inconsistent"back of house" <br /> fagade.Vertical changes in stone and brick will terminate at inside corners where necessary. Horizontal changes in <br /> materials from stone to brick or wood cladding will be done with a stone cap that projects slightly from the material above. <br /> The longest fagade of the addition will be interrupted with a projection of three classrooms that not only creates the <br /> opportunity for larger classrooms at the interior, but also helps to break up the long fagade and adds visual appeal.The new <br /> entry will be nearly identical to the south entry using a wood clad canopy, however this entrance will not be open air but <br /> act as the vestibule to the building for energy code purposes. <br /> The proposed structure of the lower school addition will be a precast backup as the storm shelter requirements are easiest <br /> met with precast structure. However,the precast at the storm shelter will have adequate architectural detailing to provide <br /> an aesthetically pleasing variety. For cost efficiencies,the structure of the remaining addition (non-storm shelter building) <br /> will also be precast however it will be clad with either wood look material or brick to complement the existing lower school <br /> building. <br /> The building roof line of the lower school addition will be a staggered flat roof design similar to the rest of the existing <br /> building. Being closest to Keller Ave and the adjacent residential lots, a one story,flat roof addition with fluctuations in <br /> height will create a cohesive addition with visual interest and it will not extend beyond the agricultural zoning height <br /> requirements.The steps in roof height will indicate a hierarchy of programs and it provides cues for the location of clearly <br /> defined entrances. <br />
The URL can be used to link to this page
Your browser does not support the video tag.