My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 05.09.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 05.09.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 2:38:16 PM
Creation date
3/6/2025 11:35:59 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Liberty Classical Academy: Phase 1—Lower School Addition <br /> 11/30/23—Revised 05/06/24 <br /> Page 3 <br /> Neighborhood commitment: <br /> To minimize disruptions, Liberty has proposed to provide adequate screening for neighbors and forgo field lighting systems <br /> and speaker-integrated scoreboard systems in the initial phases. If this changes in the future, Liberty will be sure to address <br /> this with the community in a full site plan review and community meetings. <br /> Furthermore, Liberty aims to create opportunities for neighbors, including allowing use of their trails through the property <br /> leading to Goggins Lake.This aligns with Hugo's comprehensive plan,emphasizing partnerships and innovative approaches <br /> for park and trail development and fostering community connections. <br /> Site Signage: <br /> Currently, in the first phase, Liberty has no plans to introduce additional monument signage.There will be a wall mounted <br /> sign affixed to the existing building as shown in the elevations. <br /> Traffic: <br /> The Liberty Classical Academy currently generates 153 trips in the AM peak hour and 78 trips in the school PM peak hour. <br /> With the Phase 1 expansion, it is anticipated the school will generate 330 AM peak hour trips and 183 trips in the school PM <br /> peak hour.With the full buildout of the school campus, it is anticipated the campus will generate 751 AM peak hour trips <br /> and 436 trips in the school PM peak hour. <br /> A capacity analysis was performed for Existing(2023),Opening Year(Phase 1) No-Build and Build,and Design Year(full <br /> buildout) No-Build and Build scenarios.All intersections and individual movements in the Existing(2023)and Opening Year <br /> (Phase 1) No-Build/Build scenarios are anticipated to operate at LOS C or better. During the Design Year(full buildout) No- <br /> Build and Build scenarios,the westbound left turn movement at the intersection of 122"d Street&Manning Trail is <br /> anticipated to operate at LOS D and LOS F during the AM and PM peak hours, respectively. The delay per vehicle is <br /> anticipated to reach at most 53 seconds per vehicle for this movement and all other movements at the intersection operate <br /> at LOS B or better in all scenarios. Because of this, implementation of a signal or other traffic control alternatives are not <br /> recommended. <br /> Queueing for the site was analyzed,the pick-up/drop-off school's queueing was modeled to determine the maximum <br /> anticipated queues for a typical school day.The site provides storage of dedicated vehicular queueing which is sufficient to <br /> store the anticipated queues.All queues are anticipated to remain on site and not impact any public roadways. <br /> Queueing for the Phase 1 lower school expansion is not anticipated to impact public streets because the anticipated queues <br /> will be approximately 600 feet with the Phase 1 expansion (see queueing exhibit with Civil plans). <br /> Per the results of the analysis,the mitigation recommended for the Phase 1 lower school expansion project are listed <br /> below: <br /> • A northbound right turn lane should be constructed at the site access along Keller Avenue for Phase 1 buildout. <br /> • A southbound right turn lane on Keller Avenue at 122"d Street for the Phase 1 buildout. <br />
The URL can be used to link to this page
Your browser does not support the video tag.