My WebLink
|
Help
|
About
|
Sign Out
Home
PC PACKET 07.25.2024
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2024 PC Packets
>
PC PACKET 07.25.2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2025 1:58:26 PM
Creation date
3/6/2025 11:40:11 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br /> July 22, 2024 <br /> Page 2 <br /> 9. Drainage and utility easements for the sanitary sewer and watermain are shown correctly on <br /> the plans. <br /> Stormwater Management <br /> 10. As part of the Shores of Oneka Lake development, the planned stormwater management for <br /> this site was accommodated in the original design. We have confirmed the assumptions for <br /> the site at the time of initial design are in accordance with current plans. In fact, the site <br /> contains less impervious coverage than previously anticipated. The site is meeting water <br /> quality requirements primarily through water reuse for onsite irrigation. The remaining water <br /> quality required will be provided by the stormwater ponds previously constructed as part of <br /> the Shores of Oneka Lake Development. <br /> 11. The site meets rate control requirements through the stormwater ponds within the overall <br /> development. <br /> 12. The applicant will need to submit the water reuse plans for the development for review. <br /> 13. Detailed redline comments have been provided to the applicants engineer related to storm <br /> sewer layout, public vs. private ownership, and maintenance responsibilities. <br /> Wetlands <br /> 14. No wetland impacts are proposed with the Oneka Fields development. <br /> Thank you for the opportunity to provide comments on this project. Additional detailed, red-lined <br /> comments for streets and utilities have been provided to the applicant's engineer. We will have <br /> meetings to discuss how they propose to modify the plans. These minor comments will need to <br /> be addressed prior to approval of the construction plans. If you have any questions, please do <br /> not hesitate to contact me at 651-286-8463. <br /> Sincerely, <br /> %%/ WF1w' <br /> Mark Erichson, PE <br /> City Engineer <br /> cc: Scott Anderson, Public Works Director(email only) <br /> Liz Finnegan, Senior Engineering Technician (email only) <br /> Brian Krystofiak, Carlson McCain (email only) <br /> S:\Users\R Juba\DEVELOPMENT PROJECTS\The Shores of Oneka Lake\Oneka Fileds_PUD <br /> Amendment and Apartment Site Plan\Engineers Memo and Comments\Engineers Memo Oneka <br /> Fields Apartments- 07.22.24.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.