My WebLink
|
Help
|
About
|
Sign Out
Home
2025.03.03 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.03.03 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 1:13:21 PM
Creation date
3/18/2025 1:08:04 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
3/3/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />February 27, 2025 <br /> <br /> <br /> <br />Honorable Mayor and City Council <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Authorization to Prepare a Feasibility Study for the 2026 Bald Eagle Industrial Park Area <br />Street Improvement Project <br /> <br /> <br />Dear Mayor and Council, <br /> <br />Each year the city reviews and determines priorities for upcoming capital improvement projects <br />throughout the city. At the August 29, 2024 City Council work session, staff presented pavement <br />and trail ratings, a draft 5-year CIP, and corresponding funding analysis. City Council approved <br />the 5-year CIP at the September 16, 2024 City Council meeting. <br /> <br />Staff recommends moving forward with the Capital Improvement Plan project identified for 2026 <br />in the Capital Improvement Plan at this time as there are components to the project such as <br />easement acquisition for the trail along 130th Street, two BNSF rail crossings and the public <br />improvement process, which all require additional time and planning. Roadways included in the <br />project are identified below: <br /> <br />• 140th Street N (From TH 61 to Fenway Boulevard N) <br />• Fenway Boulevard N (From 130th Street N to 140th Street N) <br />• Fenway Boulevard Ct N (From Fenway Boulevard N to its eastern termini) <br />• 130th Street N (from TH 61 to Europa Trail N) <br />• Farnham Avenue N (from 130th Street N to its southern termini) <br /> <br />Trails to be reconstructed include the following and will be part of the future Hardwood Creek <br />Regional Trail: <br /> <br />• 140th Street N (From TH 61 to Fenway Boulevard N) <br />• Fenway Boulevard N (From 130th Street N to 140th Street N) <br /> <br />A new trail is proposed to be constructed in the following location: <br /> <br />• 130th Street N (from TH 61 to Fenway Boulevard N) <br /> <br /> <br />The figure below is a portion of the CIP with roadways in blue shown identified as the 2026 Bald <br />Eagle Industrial Park Area Street Improvement Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.