Laserfiche WebLink
<br /> 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM February 19, 2025 <br /> <br /> <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Munger Property <br />Sketch Plan Review <br /> WSB Project No. 027763-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the Sketch Plan for the Munger property. We have reviewed the following <br />information related to this application: <br /> <br />• Munger Property Sketch Plan Revised dated July 11, 2024, for Capstone Homes, Inc. by <br />Pioneer Engineering – 5311 165th Street <br />• Munger Property Narrative by Capstone Homes, dated January 27, 2025 <br /> <br />Based on the review of the documents, we offer the following comments related to this <br />application: <br /> <br />General/Access/Existing Conditions <br /> <br />1. The subject property is located along the south side of 165th Street approximately one- <br />half mile west of Highway 61. Two access points are proposed from 165th Street with <br />connections also being made to Ferrara Avenue and Finale Avenue that were <br />constructed as part of the Meadows at Hugo Development. <br />2. 165th Street is a rural section gravel roadway that is approximately 24-ft in width, with the <br />exception of the first 400 feet of 165th Street immediately west of Highway 61. This <br />portion of Highway 61 has bituminous surfacing. <br />3. The Hugo 2040 Comprehensive Plan identifies 165th street as an urban section minor <br />collector from Highway 61 to Elmcrest Avenue with a future trail making connection to the <br />Hardwood Creek Regional Trail. <br />4. The development team contends that 165th Street should remain a rural-section roadway <br />base on a number of factors which include, but are not limited to size of developable <br />parcels, presence of wetlands limiting buildable area along the corridor, and cost. <br />5. As part of a proposed upcoming study for the 165th Street corridor, staff would evaluate a <br />number of different development scenarios along this corridor, project traffic volumes and <br />patterns, evaluate appropriate location of trail, determine whether the roadway should be <br />rural or urban, and timing of improvements. <br />6. Properties along 165th Street have not been platted and do not have dedicated road right <br />of way. Property lines extend into the roadway. <br />7. The proposed development would need to dedicate the right of way along 165th Street. <br />The width will depend on the outcome of the 165th Street Corridor study. <br />8. Past practice would indicate the developer would be responsible to pay an amount equal <br />to the cost of constructing one half of an urban section roadway along their road <br />frontage.