Ms. Rachel Juba <br />February 19, 2022 <br />Page 2 <br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\2_Misc. Property Information\Mary Munger <br />Property - 5311 165th St N\Capstone Homes\25-001 Munger Property Sketch Plan <br />Application\Engineers Memo Munger Property - Concept Plan - 021925.docx <br />9. Due to the nature of the corridor (smaller developments and limited buildable property <br />immediately adjacent to the roadway), it is challenging and costly to construct an urban <br />roadway in one singular project. Alternatively, with the increased traffic on a gravel <br />roadway, the developer would be responsible to pave the rural section roadway from TH <br />61 to their westerly property line. As part of the city roadway capital improvements plan, <br />funding could be made available to pave the remaining 165th Street as a rural section <br />roadway. This will be further evaluated as part of the above reference study. <br />10. A number of proposed lots are proposed to have direct access to 165th Street, which <br />would not be allowed due to its minor collector road status. <br /> <br />Utility Plan <br /> <br />11. As identified in the City’s Comprehensive Water Supply and Distribution Plan, a 24” trunk <br />watermain will need to be extended north from the existing 24” trunk watermain extended <br />as part of the Meadows of Hugo development located directly to the south, with the City <br />of Hugo paying for oversizing costs. <br />12. The MCES interceptor is along the west property line of the Munger Property. <br />13. Trunk Sanitary Sewer was extended from the MCES Interceptor along the Munger south <br />property line as part of the Meadows at Hugo development. Sanitary sewer will need to <br />be extended from the sanitary sewer provided from the south <br />14. If the project is to be phased, a staging plan will be required to be shown with utility work <br />being identified to occur within the final platted area only. If grading is different from the <br />phasing plan for utilities or final plat area, a plan addressing temporary drainage <br />measures outside the platted area will be required. <br /> <br />Stormwater Management/Wetlands <br /> <br />15. Volume control/water quality standard will be required, which is 1.1 inches off new <br />impervious surfaces. Water reuse will be the preferred BMP option for the site for volume <br />reduction. If an additional BMP is to be used, the TP removal factor from RCWD Rule C, <br />Table C1. must be applied. <br />16. Peak stormwater runoff rates for the proposed project must not exceed existing rates for <br />the 2-year and 10-year 24-hour rainfall events using Atlas 14 rainfall depths. <br />17. Peak stormwater runoff rates for the 100-year 24-hour rainfall event is limited to 0.1 <br />cfs/acre. <br />18. Lowest building opening must be at least 3’ above the 100-yr HWL for both wetlands and <br />BMPs and 4’ above the current groundwater elevations. <br />19. Private ditches to JD3 are located onsite. Maintain private ditch drainage to JD3. <br />Developer to confirm with RCWD if a permit for Rule I is needed. <br />20. No 100-year floodplains located onsite. <br />21. Stormwater Management facilities will be required to be within drainage and utility <br />easements. <br />22. The applicant is proposing to utilize stormwater reuse as part of their stormwater <br />management plan. <br />23. A wetland delineation on the parcel has been completed however this has yet to go <br />through the Technical Evaluation Panel for approval. <br />24. The concept plan shows a number of impacts to wetlands. The applicant may find it <br />helpful to have a pre-application meeting with the Technical Evaluation Panel to get a <br />better idea of what impacts may or may not be allowed <br />