My WebLink
|
Help
|
About
|
Sign Out
Home
2025.04.07 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.04.07 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2025 2:18:32 PM
Creation date
4/9/2025 2:15:13 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
4/7/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Shores of Oneka Lake\The Shores of Oneka Lake 5th Addition Final Plat\LTR-r juba-Shores of Oneka Lake <br />5th Final Plat - 2025.03.21.docx 178 E 9TH STREET | SUITE 200 | SAINT PAUL, MN | 55101 | 651.286.8450 | WSBENG.COM March 21, 2025 <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Shores of Oneka Lake 5th Addition <br />Final Plat Review <br /> WSB Project No. 028491-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the Final Plat submittal for the Shores of Oneka Lake 5th Addition. We have <br />reviewed the following information related to this application: <br /> <br />• The Shores of Oneka Lake 5th Addition Final Plat Submittal dated February 21, 2025, by <br />Carlson McCain <br />• The Shores of Oneka Lake 5th Addition Sanitary Sewer, Watermain, Storm Sewer, and <br />Street Construction Plans dated February 21, 2025. <br />• The Shores of Oneka Lake 5th Addition Grading, Development & Erosion Control Plans <br />dated February 21, 2025. <br /> <br />Based on the review of the documents, we offer the following Engineering comments related to <br />this application: <br /> <br />General/Access <br /> <br />1. The subject property is located east of Highway 61 at 159th Street and north of the existing <br />Oneka Shored 3rd Additon. <br />2. The roundabout at TH 61 and 159th Street will serve as the primary access for the <br />development and is open to traffic. <br />3. Detailed redline comments have been provided on the plans and sent to the applicants <br />engineer so they can be addressed in future submittals. <br /> <br />Utility Plan <br /> <br />4. As identified in the City’s Comprehensive Water Supply and Distribution Plan, a 12” trunk <br />watermain was extended north from the Oneka Ponds development, through previous <br />phases of this development, connecting to the 12” crossing at the 159th St roundabout. This <br />phase extends 12” trunk watermain along Grafton Avenue to allow for extension to the <br />properties to the north. <br />5. The construction plans correctly show this 12” trunk watermain being extended along Grafton <br />Avenue through the 5th Addition, with the City of Hugo paying for oversizing costs. <br />6. The sanitary sewer will be connecting into the 8” sanitary sewer stubs provided in previous <br />phases of this development. <br /> <br />Stormwater Management <br /> <br />7. The site is meeting water quality requirements primarily through water reuse for onsite <br />irrigation. The remaining water quality required will be provided by the stormwater ponds <br />onsite.
The URL can be used to link to this page
Your browser does not support the video tag.