Laserfiche WebLink
Ms. Rachel Juba <br />March 25, 2021 <br />Page 2 <br />S:\Users\R_Juba\DEVELOPMENT PROJECTS\The Shores of Oneka Lake\The Shores of Oneka <br />Lake 5th Addition Final Plat\LTR-r juba-Shores of Oneka Lake 5th Final Plat - 2025.03.21.docx <br />8. The site meets rate control requirements through the stormwater ponds onsite. <br />9. Detailed redline drainage comments on the 5th Addition have been provided to the applicant <br />and will need to be addressed prior to the issuance of the stormwater permit. <br /> <br />Wetlands <br /> <br />10. Site grading is consistent with the overall grading plan and preliminary plat approvals. All <br />wetland impacts are proposed as part of the 2nd addition. <br /> <br /> <br />Thank you for the opportunity to provide comments on this project. Additional detailed, red-lined <br />comments have been provided to the applicant’s engineer and we have had meetings to discuss <br />how they propose to modify the plans. These minor comments will need to be addressed prior to <br />approval of the construction plans. If you have any questions, please do not hesitate to contact <br />me at 651-286-8463. <br /> <br />Sincerely, <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only) <br /> Brian Krystofiak, Carlson McCain (email only)