My WebLink
|
Help
|
About
|
Sign Out
Home
2025.10.06 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.10.06 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 1:54:48 PM
Creation date
11/3/2025 1:52:22 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Number: BF-20583561 <br /> <br /> <br />5 of 59 <br /> <br /> <br />EXHIBIT "C" <br /> <br />CONTRACTOR REQUIREMENTS <br /> <br />1) General <br /> <br />A. The Contractor must cooperate with BNSF RAILWAY COMPANY, hereinafter referred to <br />as "Railway" where work is over or under on or adjacent to Railway property and/or <br />right-of-way, hereafter referred to as "Railway Property", during the construction of <br />_______________________________________________________________________ <br />_______________________________________________________________________ <br />______________________________________________________________________. <br /> <br />B. The Contractor must execute and deliver to the Railway duplicate copies of the Exhibit “C- <br />1” Agreement, in the form attached hereto, obligating the Contractor to provide and <br />maintain in full force and effect the insurance called for under Section 3 of said Exhibit “C- <br />1”. Questions regarding procurement of the Railroad Protective Liability Insurance should <br />be directed to Rosa Martinez at Marsh, USA, 214 -303-8519. <br /> <br />C. The Contractor must plan, schedule and conduct all work activities so as not to interfere <br />with the movement of any trains on Railway Property. <br /> <br />D. The Contractor's right to enter Railway's Property is subject to the absolute right of Railway <br />to cause the Contractor's work on Railway's Property to cease if, in the opinion of Railway, <br />Contractor's activities create a hazard to Railway's Property, employees, and/or <br />operations. Railway will have the right to stop construction work on the Project if any of the <br />following events take place: (i) Contractor (or any of its subcontractors) performs the <br />Project work in a manner contrary to the plans and specifications approved by Railway; (ii) <br />Contractor (or any of its subcontractors), in Railway’s opinion, prosecutes the Project work <br />in a manner which is hazardous to Railway property, facilities or the safe and expeditious <br />movement of railroad traffic; (iii) the insurance described in the attached Exhibit C-1 is <br />canceled during the course of the Project; or (iv) Contractor fails to pay Railway for the <br />Temporary Construction License or the Easement. The work stoppage will continue until <br />all necessary actions are taken by Contractor or its subcontractor to rectify the situation to <br />the satisfaction of Railway’s Division Engineer or until additional insurance has been <br />delivered to and accepted by Railway. In the event of a breach of (i) this Agreement, (ii) <br />the Temporary Construction License, or (iii) the Easement, Railway may immediately <br />terminate the Temporary Construction License or the Easement. Any such work stoppage <br />under this provision will not give rise to any liability on the part of Railway. Railway’s right <br />to stop the work is in addition to any other rights Railway may have including, but not limited <br />to, actions or suits for damages or lost profits. In the event that Railway desires to stop
The URL can be used to link to this page
Your browser does not support the video tag.