Contract Number: BF-20583561 <br /> <br /> <br />8 of 59 <br /> <br />▪ 30'-0" Vertically above top of rail for electric wires carrying 15,000 volts to 20,000 <br />volts <br />▪ 34'-0" Vertically above top of rail for electric wires carrying more than 20,000 volts <br /> <br />D. Upon completion of construction, the following clearances shall be maintained: <br /> <br />▪ 25’ Horizontally from centerline of nearest track <br />▪ 23’ 6” Vertically above top of rail <br /> <br />E. Any infringement within State statutory clearances due to the Contractor's operations must <br />be submitted to the Railway and to the City of Hugo and must not be undertaken until <br />approved in writing by the Railway, and until the City of Hugo has obtained any necessary <br />authorization from the State Regulatory Authority for the infringement. No extra <br />compensation will be allowed in the event the Contractor's work is delayed pending Railway <br />approval, and/or the State Regulatory Authority's approval. <br /> <br />F. In the case of impaired vertical clearance above top of rail, Railway will have the option of <br />installing tell-tales or other protective devices Railway deems necessary for protection of <br />Railway operations. The cost of tell-tales or protective devices will be borne by the Agency. <br /> <br />G. The details of construction affecting the Railway's Property and tracks not included in the <br />contract plans must be submitted to the Railway by City of Hugo for approval before work <br />is undertaken and this work must not be undertaken until approved by the Railway. <br /> <br />H. At other than public road crossings, the Contractor must not move any equipment or <br />materials across Railway's tracks until permission has been obtained from the Railway. <br />The Contractor must obtain a "Temporary Construction Crossing Agreement" from the <br />Railway prior to moving his equipment or materials across the Railways tracks. The <br />temporary crossing must be gated and locked at all times when not required for use by the <br />Contractor. The temporary crossing for use of the Contractor will be constructed and, a t <br />the completion of the project, removed at the expense of the Contractor. <br /> <br />I. Discharge, release or spill on the Railway Property of any hazardous substances, oil, <br />petroleum, constituents, pollutants, contaminants, or any hazardous waste is prohibited <br />and Contractor must immediately notify the Railway's Resource Operations Center at <br />1(800) 832-5452, of any discharge, release or spills in excess of a reportable quantity. <br />Contractor must not allow Railway Property to become a treatment, storage or transfer <br />facility as those terms are defined in the Resource Conservation and Recovery Act or any <br />state analogue. <br /> <br />J. The Contractor upon completion of the work covered by this contract, must promptly <br />remove from the Railway's Property all of Contractor's tools, equipment, implements and <br />other materials, whether brought upon said property by said Contractor or any