My WebLink
|
Help
|
About
|
Sign Out
Home
2025.11.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.11.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 11:07:44 AM
Creation date
1/23/2026 10:52:37 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/17/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />130th St Trail Extension Feasibility <br />City of Hugo, Minnesota <br />WSB Project No. R-013720-000 Page 3 <br />The City of Hugo (City) and Washington County expanded the study area to <br />extend south from the Fenway trail at 130th St N to identify potential alternative <br />trail alignments that may be suitable as an alternative Hardwood Creek Regional <br />Trail (HCRT) route south from 130th St N to the Falcon Court N / 120th St N <br />location. <br /> <br />Several options for an alternative HCRT route were considered and discussed <br />with project stakeholders. Plans for the alternative trail routes were developed up <br />to a 30% plan level with corresponding estimates of probable costs. Based upon <br />the cost factors that were developed, Washington County decided upon <br />abandoning further study of this trail route alternative within this feasibility project, <br />as they intend to conduct further trail planning studies separately that would <br />expand upon the existing HCRT. While 30% plans and estimates were <br />developed for the HCRT alternatives, they are not included in this memo. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This memo summarizes the design process, design option considerations that <br />were investigated, and the feasibility of implementing the preliminary design <br />specifically for the 130th St N trail extension between Fenway Blvd N and Forest <br />Blvd N / Hwy 61. <br />
The URL can be used to link to this page
Your browser does not support the video tag.