Laserfiche WebLink
<br /> <br /> <br />130th St Trail Extension Feasibility <br />City of Hugo, Minnesota <br />WSB Project No. R-013720-000 Page 3 <br />The City of Hugo (City) and Washington County expanded the study area to <br />extend south from the Fenway trail at 130th St N to identify potential alternative <br />trail alignments that may be suitable as an alternative Hardwood Creek Regional <br />Trail (HCRT) route south from 130th St N to the Falcon Court N / 120th St N <br />location. <br /> <br />Several options for an alternative HCRT route were considered and discussed <br />with project stakeholders. Plans for the alternative trail routes were developed up <br />to a 30% plan level with corresponding estimates of probable costs. Based upon <br />the cost factors that were developed, Washington County decided upon <br />abandoning further study of this trail route alternative within this feasibility project, <br />as they intend to conduct further trail planning studies separately that would <br />expand upon the existing HCRT. While 30% plans and estimates were <br />developed for the HCRT alternatives, they are not included in this memo. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />This memo summarizes the design process, design option considerations that <br />were investigated, and the feasibility of implementing the preliminary design <br />specifically for the 130th St N trail extension between Fenway Blvd N and Forest <br />Blvd N / Hwy 61. <br />