My WebLink
|
Help
|
About
|
Sign Out
Home
2025.11.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.11.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 11:07:44 AM
Creation date
1/23/2026 10:52:37 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/17/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
130th St Trail Extension Feasibility <br />City of Hugo, Minnesota <br />WSB Project No. R-013720-000 <br />Page 4 <br />3. Planning Process <br />3.1 Existing Conditions & Issues <br />Existing Conditions <br />The 130th St N corridor between Fenway Blvd N and Hwy 61 is a 40 foot wide, 2- <br />lane collector road with B618 curb and gutter that is widened at the railroad <br />crossing to accommodate one westbound lane and right, left and thru eastbound <br />lanes. The current speed limit is 30 mph. <br />This corridor primarily runs through a General Industrial district, changing to <br />residential at Fenway Blvd N. 130th St N crosses existing railroad tracks that <br />terminates at 140th St N where the Hardwood Creek Regional Trail begins within <br />the old railroad corridor. <br />130th Street N receives heavy truck traffic as well as local residential traffic. The <br />intersection at Hwy 61 has also been identified as having congestion concerns <br />during peak hours with vehicular stacking occurring back to Farnham Ave. <br />Vehicles at intersection of 130th St N & Hwy 61 Image:Google Streetview, Image Capture, May 2019
The URL can be used to link to this page
Your browser does not support the video tag.