My WebLink
|
Help
|
About
|
Sign Out
Home
2025.11.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.11.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 11:07:44 AM
Creation date
1/23/2026 10:52:37 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/17/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />130th St Trail Extension Feasibility <br />City of Hugo, Minnesota <br />WSB Project No. R-013720-000 Page 6 <br />Pedestrian Connectivity <br />The 130th St N corridor currently lacks separated pedestrian facilities between <br />Fenway Blvd N and Hwy 61. Planned residential and road developments on the <br />east side of Hwy 61 will incorporate trail connections along 130th St N which will <br />extend up to the Hwy 61 crosswalk locations. There are currently two pedestrian <br />crosswalks, one that crosses Hwy 61 on the northern location and one across <br />130th St N intersection with pedestrian activated signals in order to cross both <br />roadways. The crosswalk over Hwy 61 leads to a concrete pedestrian ramp <br />where the trail terminates. <br /> <br />The following section illustrates existing conditions along 130th St N with the <br />existing conditions within the overall corridor shown on the following pages. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.