My WebLink
|
Help
|
About
|
Sign Out
Home
2025.11.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.11.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 11:07:44 AM
Creation date
1/23/2026 10:52:37 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/17/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report <br />2026 Bald Eagle Industrial Park Area Street Improvement Project <br />S.A.P. 224-101-003, 224-108-003, 224-110-003 <br />City of Hugo <br />WSB Project No. 028436-000 Page 3 <br />2. Introduction <br />2.1 Authorization <br />The City Council authorized the preparation of a feasibility study on February 27, <br />2025. This expands on the work previously done by WSB on behalf of the City with <br />the 130 th Street Trail Extension Feasibility Report, dated May 1, 2020. This previous <br />feasibility report is included in Appendix D . <br />2.2 Scope <br />T he proposed improvements include the following : <br />• Full depth removal of the existing pavement , placement of new pavement, <br />spot curb and gutter replacements , and storm, sanitary, watermain <br />adjustments on: <br />o 130 th Street N from Europa Trail N to about 200 feet west of Forest B lvd <br />/ TH 61 <br />o Farnham Avenue N from the south terminus to 130 th Street N <br />o Fenway B lvd N from 130 th Street N to 140 th Street N <br />o 140 th Street from Fenway B lvd N to Forest B lvd / TH 61 <br />• 2” mill and overlay of the bituminous pavement, spot curb and gutter <br />replacements, and storm, sanitary and watermain adjustments on: <br />o Fenway B lvd Court N <br />o 130 th Street N from about 200 feet west of Forest B lvd / TH 61 to TH 61 <br />• R epla cement of the existing bituminous trail on the west side of Fenway B lvd , <br />as well as replacing the current concrete sidewalk on the south side of 140 th <br />Street with a 10 -foot bituminous trail. This new trail will serve as an interim <br />route for the Washington County Hardwood Creek Regional Trail. Additionally, <br />the trail on the west side of Europa Court N will also be replaced. <br />• Removal and replacement of street lighting along Fenway Blvd N and 130 th <br />Sreet N. <br />• A new 8 -foot bituminous trail on the north side of 130 th Street N from Fenway <br />Blvd N to Forest B lvd / TH 61 . <br />2.3 Data Available <br />City staff and WSB collaborated to acquire multiple forms of data to use in <br />determining the maintenance and improvements needed for this project. This data <br />included: <br />• Geotechnical pavement cores to determine the existing pavement condition <br />• Topographic survey of the project area
The URL can be used to link to this page
Your browser does not support the video tag.