My WebLink
|
Help
|
About
|
Sign Out
Home
2025.11.17 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.11.17 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 11:07:44 AM
Creation date
1/23/2026 10:52:37 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
11/17/2025
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Feasibility Report <br />2026 Bald Eagle Industrial Park Area Street Improvement Project <br />S.A.P. 224-101-003, 224-108-003, 224-110-003 <br />City of Hugo <br />WSB Project No. 028436-000 Page 13 <br /> <br />Assessments were applied only to properties that have direct driveway access to the <br />project streets or where a driveway could feasibly be constructed in the future. For <br />the four single -family lots on 14 0 th Street, only two of them currently have driveways <br />on 140 th, so only those two lots are assessed on a per -unit basis. For all other lots, <br />the assessment was calculated at a rate of $76.87 per front foot, as detailed in the <br />calculations above. <br />According to the assessment policy, the townhomes located on the west side of <br />Fenway Boulevard and the north side of 130 th Street N would generally be assessed <br />at one -half unit for the improvements along 130 th Street and Fenway B lvd , with the <br />remaining one -half unit to be assessed once the internal roads to the properties are <br />improved. Since none of these properties have direct access to 130 th Street N or <br />Fenway B lvd , they will not be assessed for this project. Instead, they will be fully <br />assessed when impr ovements to Europa Trail Way N, 132 nd Street N, Europa Court <br />N, or 134th Street N are made. <br />City -owned properties are exempt from assessments, as city funds cover the <br />remaining project costs. <br /> <br /> <br />Urban Overlay Full Depth Reclamation <br />Single Family (per unit)2,100.00$ 4,100.00$ <br />Comm, Ind, MF (per foot front <br />footage)39.37$ 76.87$ <br />Preliminary Assessment Rates <br />Pavement Rehab Method
The URL can be used to link to this page
Your browser does not support the video tag.