My WebLink
|
Help
|
About
|
Sign Out
Home
2025.12.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.12.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 11:08:24 AM
Creation date
1/23/2026 10:54:36 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/15/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2025-__ <br /> <br />APPROVING A PRELIMINARY AND FINAL PLAT, SITE PLAN AND <br />CONDITIONAL USE PERMIT FOR KWIK TRIP, INC. FOR A GAS STATION <br />AND CONVENINCE STORE WITH ATTACHED CAR WASH ON THE <br />PROPERTY LOCATED NORTH OF 159TH STREET NORTH AND EAST OF <br />FOREST BOULEVARD NORTH <br /> <br />WHEREAS, Kwik Trip, Inc. has requested approval of a site plan and conditional use <br />permit for a gas station and convenience store with attached car wash on the property <br />legally described as: <br /> <br />See Attached <br /> <br />WHEREAS, the Planning Commission has reviewed said preliminary plat, site plan, and <br />conditional use permits at a duly called a public hearing on December 11, 2025, and <br />recommends approval subject to the conditions listed in this resolution. <br /> <br />NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF <br />THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the <br />preliminary plat, site plan, and conditional use permit for Kwik Trip, Inc. with the <br />following findings and conditions: <br /> <br />1. Approval is contingent upon City Council approval of a comprehensive plan <br />amendment and rezoning. <br /> <br />2. All items on the Engineer’s memo and “red-line” detailed engineering comments that <br />have been sent directly to the developer’s engineer dated December __, 2025 shall be <br />met. <br /> <br />3. The development shall be consistent with the plans submitted on December __, 2025 <br />and as amended by this resolution. <br /> <br />4. Prior to the installation of any signs, the developer shall obtain a sign permit. <br /> <br />5. The developer is responsible for obtaining all local, State, and Federal permits. <br /> <br /> <br />Prior to subdivision and the issuance of a building permits: <br /> <br /> <br />6. All SAC and WAC (connection and trunk) fees per the fee schedule shall be paid. <br /> <br />7. Stormwater trunk fee per the fee schedule shall be paid. <br /> <br />8. The applicant shall provide an updated grading plan based on staff’s comments. Staff <br />will continue to work with the applicant on a grading plan that generally lowers the <br />site and makes it more consistent with the elevation of neighboring properties.
The URL can be used to link to this page
Your browser does not support the video tag.