Laserfiche WebLink
<br /> <br />1 <br />7 <br />8 <br /> <br />E <br /> <br />9 <br />T <br />H <br /> <br />S <br />T <br />R <br />E <br />E <br />T <br /> <br /> <br />| <br /> <br />S <br />U <br />I <br />T <br />E <br /> <br />2 <br />0 <br />0 <br /> <br />| <br /> <br /> <br />S <br />A <br />I <br />N <br />T <br /> <br />P <br />A <br />U <br />L <br />, <br /> <br />M <br />N <br /> <br /> <br />| <br /> <br /> <br />5 <br />5 <br />1 <br />0 <br />1 <br /> <br /> <br />| <br /> <br /> <br />6 <br />5 <br />1 <br />. <br />2 <br />8 <br />6 <br />. <br />8 <br />4 <br />5 <br />0 <br /> <br /> <br />| <br /> <br /> <br />W <br />S <br />B <br />E <br />N <br />G <br />. <br />C <br />O <br />M <br /> <br /> <br /> <br />December 8, 2025 <br /> <br /> <br />Ms. Rachel Juba <br />Community Development Director <br />City of Hugo <br />14669 Fitzgerald Avenue North <br />Hugo, MN 55038 <br /> <br />Re: Final Site Plan Review, Preliminary and Final Plat Review <br /> Kwik Trip <br /> WSB Project No. 13857-000 <br /> <br />Dear Ms. Juba: <br /> <br />We have reviewed the final site plan submittal for the above-referenced project and in particular, <br />the following plans related to this request: <br /> <br />• Revised Preliminary Plans and Plat dated 12/04/2025, by Carlson Engineering <br />• Stormwater Management Memo dated August 8, 2025, by Carlson Engineering <br />• Traffic Impact Analysis dated August 2025, by Kimley Horn <br /> <br />Based on the review of the revised plan documents, we offer the following comments related to <br />this application: <br /> <br />Site Grading <br /> <br />1. The applicant will need to apply for an MPCA NPDES permit due to the size of area <br />disturbed. The City will need to receive a copy of this permit in advance of any work <br />taking place. <br />2. Staff has provided comments related to the grading plan and modifications will be <br />required prior to plans being approved for construction. <br /> <br />Stormwater Management <br /> <br />3. As part of the Shores of Oneka Lake development, the planned stormwater management <br />for this site was accommodated in the original design. We have confirmed the <br />assumptions for the site at the time of initial design are in accordance with current plans. <br />Water quality and rate control requirements are met through the existing stormwater <br />ponds within the Shores of Oneka Lake development which are used for water reuse. <br />4. Drainage from the site will tie into the storm sewer stub within 159th Street that <br />discharges to the Shores of Oneka stormwater pond. <br />5. Detailed redline comments have been provided to the applicants engineer related to <br />storm sewer design and emergency overflow elevations. <br />6. No wetlands are present on the site. <br />7. Andy projects adjacent to MNDOT ROW will require a MNDOT drainage permit. <br /> <br /> <br /> <br /> <br />