My WebLink
|
Help
|
About
|
Sign Out
Home
2025.12.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2025 CC Packets
>
2025.12.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2026 11:08:24 AM
Creation date
1/23/2026 10:54:36 AM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
12/15/2025
Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Rachel Juba <br />December 5, 2025 <br />Page 2 <br />Transportation/ROW <br /> <br />8. The plan proposal is for two access points along 159th Street. Staff have worked with the <br />applicant on access location. Revisions have been made that have resulted in the <br />current plan. The main full access point is located as far east of the roundabout at TH 61 <br />and 159th Street. The other drive is shown as a right in/right right/out. This will require a <br />minor extension of the 159th Street center median to prevent left-turning movement <br />attempts. The applicant could also make this drive a right out only and modify the plan <br />slightly. Both options are acceptable to staff. <br />9. The traffic impact analysis has been reviewed by WSB and MNDOT and the applicant <br />has incorporated comments into the plan. It should be noted that the roundabout is <br />expected to continue to operate at an acceptable level of service. As area traffic <br />continues to grow over the next twenty years, the operational level of service for the <br />northbound leg will decrease as expected. <br />10. A cross-access agreement for the easterly entrance will need to be prepared, reviewed, <br />and approved by the City to accommodate future access for the parcel directly to the east <br />of the proposed Kwik Trip. <br /> <br /> <br />Sanitary Sewer Service <br /> <br />11. An existing 8” PVC sanitary sewer service to the property was installed as part of the <br />Shores of Oneka Lake development and will be extended to provide service to the <br />proposed building. <br /> <br />Water Service <br /> <br />12. An existing 8” DIP watermain service to the property was installed as part of the Shores <br />of Oneka Lake development and will be extended to provide service to the proposed <br />building. <br />13. A fire hydrant is required to be added to provide adequate fire protection as requested by <br />the fire chief. <br /> <br />Thank you for the opportunity to provide comments on this project. Detailed, red-lined plan <br />comments have been provided to the applicant ’s engineer. These comments will need to be <br />addressed prior to approval of the construction plans. If you have any questions, please do not <br />hesitate to contact me at 612-360-1278. <br /> <br />Sincerely, <br /> <br />WSB & Associates, Inc. <br /> <br /> <br />Mark Erichson, PE <br />City Engineer <br /> <br />cc: Scott Anderson, Public Works Director (email only) <br /> Liz Finnegan, Senior Engineering Technician (email only) <br /> Max Gort, Associate Planner (email only) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.