Laserfiche WebLink
<br />9 “Frenchman Village” Sketch Plan <br />There is a roundabout shown on the plans for access to the property. Generally, staff is <br />comfortable with the roundabout, however the location may need to be moved further to the <br />south to provide proper separation from the full access on CSAH 8/Frenchman Road. <br />Additionally, the plans show a proposed gas station entrance onto Oneka Parkway. The access <br />location could cause impacts to the future signal location and is too close to the intersection at <br />CSAH 8 and Oneka Parkway. The only access to the commercial area west of Oneka Parkway <br />shall be from Victor Path. <br /> <br />The development of this property results in in the construction of a portion of Victor Path <br />(frontage road) and Fenway Boulevard. This would require connecting Fenway Boulevard to the <br />south to the Bald Eagle Industrial Park and easements acquisitions will be required. <br /> <br />A phasing plan has not been provided. It’s unclear in the sketch plan how and when the other <br />streets would be constructed. A traffic study will be required for the development to determine <br />the road phasing and required traffic improvements. When a phasing plan and traffic study is <br />provided, staff will make a recommendation on when the public improvements will be required. <br /> <br />Utilities <br /> <br />Sewer and water is available to the site in several locations. The applicant should work with the <br />City Engineer on the connection locations and watermain loops. <br /> <br />The applicant is working with Met Council on the relocation of the Met Council sanitary sewer <br />interceptor. Staff is comfortable with relocating the interceptor if the Met Council approves. We <br />will need to work with the applicant on the exact location, specifically as it bisects the proposed <br />public park. <br /> <br />Floodplain/Wetlands <br /> <br />There are significant portions of the property located in the FEMA floodplain and floodway <br />along the ditch and the south side of the property. Along with other items, this is a constraint of <br />the property that limits developable areas. The applicant has studied the area and is working with <br />FEMA to reduce the amount of areas in the floodplain and floodway. Development of the <br />property will require a Letter of Map Revision, or other approved revisions by FEMA. This is <br />feasible from an engineering perspective. <br /> <br />There are ditches that cross the property in various locations. These are the general area of <br />wetlands and will require approval from the Rice Creek Watershed District and the City of Hugo <br />for the crossing of the ditches for the development and the streets. <br /> <br />There may be some wetland impacts with the proposed development. Staff recommends the <br />applicant meet with the Technical Evaluation Panel (TEP) to discuss the impacts and mitigation <br />measures. <br /> <br />Stormwater Management/Water Reuse <br /> <br />The applicant has indicated that regional stormwater management for the site, instead of <br />individual stormwater management for each site as it develops. This will allow for efficient use