My WebLink
|
Help
|
About
|
Sign Out
Home
PC Packet 01.22.26
Hugo
>
Community Development
>
Planning & Zoning
>
Planning Commission
>
Planning Agendas/Packets
>
2026 PC Packets
>
PC Packet 01.22.26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2026 1:12:44 PM
Creation date
6/18/2026 1:11:44 PM
Metadata
Fields
Template:
Commissions
Meeting Date
1/22/2026
Document Type
Agenda/Packets
Commission Name
Planning
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sketch Plan Submittal January 12, 2026 <br />Frenchman Village Page 5 of 6 <br /> <br /> <br /> <br /> <br /> <br />JUDICIAL DITCHES <br /> <br />3 Rice Creek Watershed District Judicial Ditches cross the site. Judicial Ditch #3 Main Trunk, Judicial <br />Ditch #3 Branch 2 and Judicial Ditch #3 Branch 3. Required roadway extensions by the City <br />necessitate ditch crossings for both Fenway Avenue and Victor Path. At a minimum, large box <br />culverts will be required for each of these crossings, with the potential for a bridge structure being <br />needed for the Victor Path crossing. Judicial Ditch #3 Branch 2 will also need to be realigned in the <br />area of the City Park. The applicant has met with Rice Creek Watershed district representatives to <br />discuss this realignment. Watershed staff indicated acceptance of the proposed realignment but noted <br />a permit process that could extend from 4 to 6 months. <br /> <br />PARCEL CONSOLIDATION/EXISTING EASEMENTS <br /> <br />The development currently consists of 9 separate parcels of land. Each of these parcels has existing <br />easement encumbrances varying from one easement to several. The process to release each parcel <br />from these easements will be daunting and must be completed prior to consolidation of the parcels via <br />the platting process. <br /> <br /> <br />SITE DIMENSIONAL AND ACCESS CONSTRAINTS <br /> <br />The site is constrained by Frenchman Road to the North, and existing floodplain/Judicial Ditches to the <br />south creating a long and narrow development corridor. This is especially true for the Downtown <br />Development area, which can be as narrow as 300’ north to south. This creates a significant challenge <br />for the design and function of the Downtown area, in particular vehicular access to the <br />commercial/office/retail component. Site access from Highway 61 to the Downton Area could change <br />this dynamic but it is the applicants’ understanding that a Highway 61 access point will not be allowed. <br /> <br />Even with the site constraints noted above, the applicant believes they have met the intent of the City’s <br />downtown plan utilizing an innovative site design with the Hugo Downtown Plan in mind. <br /> <br /> <br />SOIL CORRECTIONS <br /> <br />As previously mentioned, major site grading will be required to remove portions of the development <br />site from the FEMA 100-year floodplain and create compensatory floodplain storage. In addition, <br />because of overall poor soils on the site, significant soil corrections will be needed to create stable <br />building pads and roadway sections. The full extent of required soil corrections will not be known <br />until actual site grading is taking place. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.