My WebLink
|
Help
|
About
|
Sign Out
Home
2026.05.18 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2026 CC Packets
>
2026.05.18 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 2:10:51 PM
Creation date
7/2/2026 1:55:13 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
5/18/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />10 _________ <br /> Initial <br /> <br />• Aluminum double wall slats with continuous ball & socket hinge joint and recessed <br />slat seal <br />• double wall reinforced bottom panel with stainless steel lift bar latching system <br />• Reusable slat shoes with positive snap-in securement <br />• One-piece aluminum door track / side frame, top gutter with non-marring seal, non- <br />marring side seals, bottom seal, with all wear component material to be Type 6 <br />Nylon. <br />• Roll-up doors shall be anodized gray. <br /> <br />Adjustable Shelf Tracking <br />Each compartment shall have four (4) aluminum tracks fastened to the interior sidewalls <br />to provide an adjustable mounting surface for shelving. <br /> <br />Six (6) Adjustable Shelves <br />There shall be six (6) adjustable shelving formed from .125 thick smooth aluminum sheet. <br />Each shelf shall be fastened to the tracking using four (4) adjustable shelf clips and <br />stainless-steel hardware. <br />The shelves location shall be: <br />One (1) in L1 One (1) in R1 <br />One (1) in L2 One (1) in R2 <br />One (1) in L3 One (1) in R3 <br /> <br />Left (Driver) Side Storage Hose Tray <br />One (1) storage hose tray shall be supplied and installed on top of left (driver) side <br />compartment. <br /> <br />Dimensions of the storage tray shall be 110” long X 22-3/4” wide X 8” high. <br /> <br />Black canvas with snaps shall be installed on top of the storage tray along with rear <br />protective net. <br /> <br />The area shall be designed to prevent the accumulation of water and allow for ventilation <br />to aid in drying hose in the storage area. <br /> <br />The external face of the hose tray shall be painted black. <br /> <br />Right (Passenger) Side Pre-Connect Hose Tray <br />One (1) pre-connect hose tray shall be supplied and installed on top of right (passenger) <br />side compartment. <br /> <br />Dimensions of the storage tray shall be 110” long X 22-3/4’’ wide X 8” high. <br /> <br />The hose tray shall have a 1” NH elbow pre-connected to the discharge of the pump. <br />The exact location of the elbow shall be determined at the pre-construction meeting. <br /> <br />Black canvas with snaps shall be installed on top of the storage tray along with rear <br />protective net. <br /> <br />The area shall be designed to prevent the accumulation of water and allow for ventilation <br />to aid in drying hose in the storage area. <br /> <br />The external face of the hose tray shall be painted black.
The URL can be used to link to this page
Your browser does not support the video tag.