My WebLink
|
Help
|
About
|
Sign Out
Home
2026.06.15 CC Packet
Hugo
>
City Council
>
City Council Agenda/Packets
>
2026 CC Packets
>
2026.06.15 CC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2026 2:11:23 PM
Creation date
7/2/2026 1:56:07 PM
Metadata
Fields
Template:
City Council
Document Type
Agenda/Packets
Meeting Date
6/15/2026
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spheros Environmental | www.spherosenv.com | Page 4 <br /> <br /> <br />Spheros will use MODFLOW to simulate the flow field and delineate the WHP Areas, and will <br />provide WSB and the City with a cost-effective, flexible, and appropriate model. Once the model <br />is created, the required time-of-travel zones will be used to determine the WHP Areas for the <br />City wells. Pumping rates applied to each well will be based on the maximum daily volume <br />determined from either: 1) the previous 5 years; or, 2) the projected annual pumping over the <br />next 5 years. <br />Following the initial WHPA delineation from this task, Spheros will calibrate the model and <br />complete the sensitivity analysis as required by the MDH. <br />The costs associated with modeling in Task 2 assume the aquifer parameters and hydrogeologic <br />information in the existing NMLG model are reasonably calibrated and significant changes to <br />the conceptual model and aquifer parameters will not be required. <br />Task 3: Conduct Fracture Flow and Surface Water Contribution Area Delineation (if <br />warranted) <br />A fracture flow delineation will be required for the City Wells since the Prairie du Chien and <br />Jordan sandstone aquifers are utilized by the City wells. Even wells solely completed in the <br />Jordan receive flow contribution from the overlying fractured Prairie du Chien dolomite aquifer <br />near the wellfield. The delineation will be based on MDH methodology and reflect a similar <br />approach and assumptions used to complete the previous 2013 plan’s fracture flow delineation. <br />The potential need for a Surface Water Capture Area (SWCA) will be assessed. If needed, it will <br />be delineated based on high vulnerability of the aquifer below surface water features. It is likely <br />that either the DNR’s Level-9 Auto-Catchment watershed boundaries or sewersheds will be used <br />to delineate a SWCA, pending communication with MDH. <br />Task 4: Delineate the DWSMA <br />Following completion of Tasks 1 through 3, Spheros will work with the City and MDH in <br />delineating the boundaries of the DWSMA. The DWSMA includes the surface and subsurface <br />area surrounding the wells and follows the WHPA as closely as possible in accordance with the <br />rules. The boundaries of the DWSMA will be identified using landmarks as defined in the rules. <br />To simplify the City’s management of the resulting DWSMA, particular focus will be on using <br />Minnesota Department of Transportation (MNDOT) road centerlines and quarter section <br />boundaries while also not splitting parcels into multiple parts. <br />
The URL can be used to link to this page
Your browser does not support the video tag.