Laserfiche WebLink
Spheros Environmental | www.spherosenv.com | Page 5 <br /> <br /> <br />Task 5: Assess Well Field and DWSMA Vulnerability <br />Spheros will assist with the vulnerability assessment within the DWSMA in accordance with MR <br />4720.5210. The assessment will follow the MDH’s guidance document, Assessing Well and <br />Aquifer Vulnerability for Wellhead Protection. The assessments will include a review of well <br />construction details to evaluate individual well vulnerability. Spheros will evaluate data from the <br />above tasks to assess the vulnerability of the target aquifers underlying the DWSMA. This will <br />include review of geologic logs, cross sections and maps, and existing groundwater chemistry <br />and any isotopic data. <br />Task 6: Complete Report <br />Following completion of the above tasks, Spheros will prepare a draft report. The report will <br />include the conceptual hydrogeologic model, model input and the results used to delineate the <br />WHPAs, DWSMA, and well and aquifer vulnerability assessments. After review of the draft, a final <br />report will be prepared which incorporates comments received from WSB, the City, and MDH <br />staff. Supporting data files that are Project-specific and define aquifer characteristics used in the <br />model will be delivered in ArcGIS format. <br />Task 7: Attend Project Meetings (Virtually) <br />Spheros is assuming three meetings total with two meetings being required by MDH: one for <br />the required pre-delineation meeting with the MDH hydrologist; the second will be an interim <br />meeting with Spheros and the MDH to discuss the modeling results and determine if it meets <br />MDH’s expectations. If other meetings are necessary during the Project, Spheros will notify WSB. <br />Spheros assumes the meetings with MDH will be held virtually. Costs also include attending one <br />City Council meeting (virtually) at the end of the Part 1 Project, if needed. <br />2. TIME REQUIRED <br />Upon receiving authorization, Spheros will initiate the Scope of Services, with an expected <br />completion timeframe of 8 to 10 months from the notice to proceed. Delays caused by major <br />changes in the project plans or by circumstances beyond the control of Spheros could extend <br />the time of completion. This will allow for over half of the Project timeline ahead of the March <br />2029 deadline for completion of Parts 1 and 2. <br /> <br />