My WebLink
|
Help
|
About
|
Sign Out
Home
2015.08.03 RESO 2015-39
Hugo
>
City Council
>
City Council Resolutions
>
2015 CC Resolutions
>
2015.08.03 RESO 2015-39
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:04:55 PM
Creation date
8/24/2015 4:34:29 PM
Metadata
Fields
Template:
City Council
Document Type
Resolutions
Meeting Date
8/3/2015
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2015-39 <br />APPROVING PRELIMINARY PLAT FOR CLEARWATER COVE ON <br />PROPERTY LOCATED SOUTH OF FRENCHMAN ROAD (COUNTY ROAD 8) AND <br />EAST OF EVERTON AVENUE NORTH <br />WHEREAS, D.R. Horton, Inc — Minnesota, has requested approval of a preliminary plat <br />to allow construction of 89 single family lots and 7 outlots on the 56.6 acre property <br />legally described as follows: <br />(See Attached) <br />WHEREAS, the Planning Commission has reviewed the preliminary plat at a duly called <br />Public Hearing and recommends approval, and; <br />NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF <br />THE CITY OF HUGO, MINNESOTA, that it should and hereby does approve the <br />request by D.R. Horton, Ino-- Minnesota, for a preliminary plat, subject to the following <br />conditions: <br />1. A preliminary plat is approved to allow the creation of 89 single family home lots and <br />7 outlots, in accordance with the plans and application received by the City on June <br />18, 2015, except as amended by this resolution. <br />2. Approval is contingent upon City Council approval of a rezoning to PUD for the 40.5 <br />acre portion of the site. <br />1 The preliminary phasing plan is generally approved. <br />a. Phase I shall include: <br />i. A 110 foot wide roadway and utility easement shall be dedicated to <br />the City for the portion of Oneka Parkway not within the plat for <br />construction of the road. <br />ii. The park equipment shall be fully installed per plans approved by <br />the City. The 0.47 acres (Outlot F) shall be dedicated to the City. <br />iii. The 8 foot wide bituminous public trail connection from Victor <br />Gardens as shown in phase 1 shall be installed. <br />b. Phase 2 shall include: <br />The entire length of Oneka Parkway, from CSAR 8 to the <br />development, shall be constructed as an urban section roadway to <br />City standard, with sidewalk and trail, with the first layer of <br />bituminous prior to issuance of a Certificate of Occupancy for the <br />1 st building. <br />
The URL can be used to link to this page
Your browser does not support the video tag.