Laserfiche WebLink
Resolution 2015-41 <br />Clearwater Cove Final Plat and Development Agreement <br />14. That portion of Street 9 (Oneka Parkway), along with the structure crossing Clearwater <br />Creek, located north of the northeast corner of Lot 1, Blockl, and extending northward to <br />CSAR 8 shall be constructed within the dedicated right-of-way with any future phase of <br />the development or prior to June 1, 2017, whichever comes first. The letter of credit <br />required for this plat shall include sufficient funds for this construction. The crossing <br />structure shall be built in accordance with designs and specifications as provided by the <br />City. <br />15. Prior to grading, the applicant shall obtain any necessary permits form FEMA for filing <br />the floodplain. <br />16. The developer shall obtain all necessary local, state, and federal permits. <br />17. Prior to recording the final plat: <br />a) A 110 foot wide roadway and utility easement shall be dedicated to the City for the <br />portion of Street 9 (Oneka Parkway) extending from the northeast corner of the plat to <br />CSAR 8, as shown on the preliminary plat. <br />b) The developer must obtain all necessary stormwater management and wetland <br />conservation act (WCA) permits from the City. <br />c) The developer shall pay $67,200 in full to satisfy the required cash in lieu of parkland <br />dedication requirement. <br />d) The developer shall pay the sewer and water trunk fees for each lot at final plat. The <br />City's SAC and WAC fees will be paid at the time building permits issued. <br />e) The applicant shall provide copies of the property owners association <br />documents/covenants for City review. A copy of the document shall be filed for <br />recording with the final plat. <br />f) The developer shall enter into a development agreement, shall agree to complete all <br />improvements; and pay all fees as required by the agreement. <br />Landscaping and Lighting <br />g) The landscape plan shall be revised to include the number, size, and type of trees and <br />shrubs in each proposed location. <br />h) The landscape plan shall be revised to relocate the trees behind the homes on Outlets <br />B and D, to be located along the trail. <br />i) The landscape plan shall be revised to show boulevard trees along that portion of <br />Street 9 (Oneka Parkway), located north of the northeast corner of Lot 1, Blockl, and <br />