My WebLink
|
Help
|
About
|
Sign Out
Home
1972.08.07 ORD 1972-108
Hugo
>
City Council
>
City Council Ordinances
>
1972 CC Ordinances
>
1972.08.07 ORD 1972-108
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 2:11:36 PM
Creation date
10/12/2015 10:27:36 AM
Metadata
Fields
Template:
City Council
Document Type
Ordinances
Meeting Date
8/7/1972
Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. The valuation for permit purposes shall be <br />determined by the Administrative Authority and <br />shall be calculated by multiplying the square foot <br />area of the proposed structure times the factor <br />prescribed by the State of Minnesota, Building Code <br />Division as is in effect at the time of application. <br />D. Where work for which a permit is required is <br />started or proceeded with prior to obtaining said <br />permit, the permit fee shall be doubled, but the <br />payment of such double fee shall not relieve any <br />persons from fully complying with existing codes or <br />ordinances in the execution of the work nor from <br />any other applicable penalties. <br />E. The fees and charges listed herein are exclusive <br />of fees and charges required by the State of Minnesota <br />pertaining to electrical permits and inspections. <br />F. At the discretion of the Administrative Authority, <br />an additional charge, not to exceed actual expenses <br />incurred, may be required in such instances where <br />repeated violations of the building codes and ordi- <br />nances make necessary an excessive number of rein- <br />spections in order to insure compliance with the pro- <br />visions of said codes and ordinances. Such charges <br />shall be payable by the permitee prior to the issuance <br />of Certificate of Occupancy. <br />Ge"Fee Schedules <br />(.1) Building Permit Fees. A fee*for each build- <br />ing permit shall be paid to the Administrative <br />Authority as set forth below: <br />BUILDING PERMIT FEE SCHEDULE <br />Plan <br />Valuation <br />Permit <br />State of Minn <br />Checking <br />u c <br />e <br />$250.00 to 1000.00 <br />$10.00 <br />.50 <br />N.A. <br />$1001.00 to $5000.00 <br />10.00 for first $1000.00 <br />.0005 of permit <br />- <br />plus .50 for each additional <br />fee -$.50 mini- <br />N.A.* <br />100.00 fraction <br />mum <br />$5001.00 to 25,000.0 <br />$30.00 for the first $5000 <br />.0005 of permit <br />plus $1.50 for each additiona <br />fee <br />N.A.* <br />1000.00 or fraction <br />25,001.00 to <br />$60.00 for first $250000 plus <br />.0005 of permi <br />25% of <br />$65,000.002.00 <br />for each additional <br />fee <br />permit fee <br />1000.00 or fraction <br />65,001.00 to <br />$140.00 for first $65,000.00 <br />..0005 of permi <br />5% of <br />$1501000.00 <br />lus 1.50 for each additional <br />fee <br />ermit fee <br />000.00 or fraction <br />150,001.00 and up <br />$267.50 for first $150,000 <br />0005 of permit <br />5% of <br />lus 1.00 for each additionalfee <br />ermit fee <br />000.00 or fraction <br />In specific instances where special design or engineering concepts are <br />involved or other unusual conditions exist, a plan checking fee not to <br />exceed 25% of the permit fee may be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.