My WebLink
|
Help
|
About
|
Sign Out
Home
2015.02.10 EDA Agenda Packet
Hugo
>
Community Development
>
EDA
>
EDA Agenda/Packets
>
2015 EDA Packets
>
2015.02.10 EDA Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2016 9:42:31 AM
Creation date
1/11/2016 8:59:49 AM
Metadata
Fields
Template:
Commissions
Meeting Date
2/10/2015
Document Type
Agenda/Packets
Commission Name
EDA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Residents were invited to attend the Parks Commission meeting of December 10, 2014. <br />Generally, residents preferred the location of features, public space alignment, parking <br />and traffic flow shown in concept three. Comments and questions also included <br />discussion on visibility of the skate park, keeping a court space, Good Neighbor Days, <br />and road re -construction plans. <br />On January 7, 2015, the Hugo Lions Club was presented the three concepts for their <br />review. The Lions Club analyzed the plans for how the park would function for Good <br />Neighbor Days. Discussion included the size of the open space, location of trees (to be <br />determined in future plans), parking, and traffic. <br />4. CONCEPT REVIEW: <br />Consideration and discussion may include: <br />• Traffic flow and access <br />• Pedestrian connections and circulation <br />® Parking layout and amount <br />• Locations of active vs. passive activities <br />• Orientation and correlation of park amenities <br />4. NEXT STEPS: <br />Staff recommends the Economic Development Authority discuss the three Lions Park <br />concept plans and provide comments for a Preliminary Master Plan. After a plan <br />finalized, work will include fundraising, planning of construction phases, and designing <br />the main park shelter. <br />ATTACHMENTS: <br />1. Project Start-Up/Programming Meeting Notes October 17, 2014 <br />2. Concept Review Meeting Notes December 16, 2014 <br />3. Lions Park Concepts <br />-2- <br />Lions Park Planning <br />February 10, 2015 <br />
The URL can be used to link to this page
Your browser does not support the video tag.