My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#17 - Rescue 1 Hose Storage and Equipment Refurbish
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
01-07-25
>
#17 - Rescue 1 Hose Storage and Equipment Refurbish
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 2:08:44 PM
Creation date
8/4/2025 2:08:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STAFF REPORT <br />DATE: January 7, 2025 <br /> CONSENT <br /> <br /> <br />TO: City Council <br />FROM: Dustin Kalis, Fire Chief <br />AGENDA ITEM: CIP Project F-004 – Rescue 1 Hose Storage and Equipment Refurbish <br />REVIEWED BY: Nicole Miller, City Administrator <br /> Clarissa Hadler, Finance Director <br /> <br />BACKGROUND: <br />The Fire Department is requesting to approval to refurbish the hose and equipment storage area <br />of Rescue 1. This project will refurbish existing hose storage area to include preconnected hose <br />capabilities and refurbish tool and equipment areas to better utilize available equipment storage <br />space. The 2025-2034 Capital Improvement Plan included this project for 2025. <br /> <br />ISSUE BEFORE COUNCIL: <br />Should the City Council approve the Rescue 1 hose storage and equipment refurbish <br />recommended by staff, as outlined in the 2025 Capital Improvement Plan? <br /> <br />PROPOSAL DETAILS/ANALYSIS: <br />The fire department replaces or refurbishes vehicles on a rotating basis based on each individual <br />vehicles need. This project will allow for better apparatus utilization and response capability. <br />The Rescue 1 refurbishment will provide a refurbish of the existing hose storage area to include <br />preconnected hose capabilities and refurbish tool and equipment areas to better utilize available <br />storage space for updated equipment. The project will be completed by Rosenbauer as they were <br />the original builders of the apparatus. <br /> <br />FISCAL IMPACT: <br />The cost of this project has a budgeted amount of $30,000.00 and will be funded through the <br />vehicle replacement fund as identified in the 2025 CIP. <br /> <br />OPTIONS: <br />- Approve Rescue 1 hose storage and equipment refurbish project. <br />- Do not approve project. <br /> <br />RECOMMENDATION: If removed from the consent agenda… <br /> “Motion to approve the purchase of 2025 CIP Project F-004 - 2025 Rescue 1 hose storage and <br />equipment refurbish at a cost not to exceed $30,000.00 as detailed in the City’s Purchasing <br />Policy.” <br /> <br />ATTACHMENTS: <br />• Project estimate from Rosenbauer America.
The URL can be used to link to this page
Your browser does not support the video tag.