My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#14 - I-94 Lift Station and Forecemain Improvements
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
06-17-25
>
#14 - I-94 Lift Station and Forecemain Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2025 10:14:13 AM
Creation date
8/15/2025 10:14:10 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STAFF REPORT <br />DATE: June 17, 2025 <br /> REGULAR <br /> <br />TO: City Council <br />FROM: Nate Stanley, City Engineer <br />AGENDA ITEM: Approve Plans and Specification and Order Advertisement for Bids for the <br />I-94 Lift Station and Forcemain Improvements <br />REVIEWED BY: Nicole Miller, City Administrator <br /> Clarissa Hadler, Finance Director <br /> Marty Powers, Public Works Director <br /> Chad Isakson, Assistant City Engineer <br /> <br /> <br />CORE STRATEGIES: <br /> <br />☐ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services <br />☐ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future <br />☒ Managed Growth ☒ Resilient Infrastructure <br /> <br /> <br />BACKGROUND: Improvements to the I-94 Lift Station and Forcemain located on Hudson Boulevard are <br />being completed as part of the 2025 Capital Improvement Plan. The Project was moved up in the CIP to <br />address immediate concerns with a fatigued forcemain that has resulted in multiple breaks and high-cost <br />emergency repairs. On April 1, 2025, the City Council ordered the preparation of plans and specifications <br />for the I-94 Lift Station and Forcemain Improvements. <br /> <br />The Hudson Boulevard Culvert Repair Project is also part of the 2025 Capital Improvement Plan and has <br />been included as part of this project design. The I-94 Lift Station Forcemain and 90-inch culvert cross each <br />other beneath Hudson Boulevard, resulting in the need to open cut Hudson Boulevard with a full roadway <br />closure. <br /> <br />ISSUE BEFORE COUNCIL: Should the City Council approve the Plans and Specifications and Order <br />the Advertisement for Bids for the I-94 Lift Station and Forcemain Improvements, including the Hudson <br />Boulevard Culvert Replacement? <br /> <br />PROPOSAL DETAILS/ANALYSIS: The plans and specifications have been completed for the <br />replacement of the forcemain, and the Project is ready to be advertised for contractor bids. A bid date has <br />been scheduled for July 8, 2025, with the intent of recommending a contract award at the July 15, 2025 <br />City Council meeting. <br /> <br />The improvements include the replacement of an existing 8-inch forcemain with a new 16-inch HDPE <br />forcemain, sized to meet the ultimate service flows to the I-94 Lift Station. The new forcemain will be <br />installed in the approximate location of the existing forcemain, which will be abandoned in place, and will <br />be installed through a combination of directional drilling and open cut trenching. The improvements also
The URL can be used to link to this page
Your browser does not support the video tag.