My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
#11 - Water Tower 1 Demolition Contract
LakeElmo
>
City Council
>
City Council Meeting Packets
>
2020's
>
2025
>
08-06-25
>
#11 - Water Tower 1 Demolition Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 4:29:10 PM
Creation date
8/4/2025 12:17:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STAFF REPORT <br />DATE: August 6, 2025 <br /> REGULAR <br /> <br />TO: City Council <br />FROM: Chad Isakson, Project Engineer <br />AGENDA ITEM: Accept Quotes and Award Contract for the Demolition of Water Tower <br />No. 1 <br />REVIEWED BY: Nicole Miller, City Administrator <br /> Clarissa Hadler, Finance Director <br /> Marty Powers, Public Works Director <br /> Nate Stanley, City Engineer <br /> <br /> <br />CORE STRATEGIES: <br /> <br />☐ Vibrant, inclusive, connected community ☐ Efficient, reliable, innovative services <br />☐ Responsive, transparent, adaptive governance ☐ Balanced Finances now and future <br />☐ Managed Growth ☒ Resilient Infrastructure <br /> <br /> <br />BACKGROUND: The 2025 Capital Improvement Plan includes the demolition of Water Tower No. 1 as <br />the facility has reached the end of its useful life and has been offline for several years. The existing 75,000- <br />gallon tank is in the Old Village Area off Langly Court just south of the railroad tracks. <br /> <br />Staff worked with SEH to prepare a quote package to removal the tower and restore the site once the work <br />is complete. <br /> <br />ISSUE BEFORE COUNCIL: Should the City Council accept quotes and award a contract for the <br />demolition of Water Tower No. 1? <br /> <br />PROPOSAL DETAILS/ANALYSIS: The size and elevation of Water Tower No. 1 does not support Lake <br />Elmo’s ultimate water distribution system needs to support the comprehensive plan. The tower was taken <br />offline as a part of the Old Village Phase 5 and 6 Improvements (2021) project. All telecommunication <br />companies have removed their equipment from the water tower, and it is ready to be taken down. <br /> <br />A quote package was prepared and distributed to three reputable companies that complete this type of work. <br />One quote was received from Iseler Demolition, Inc. in the amount of $100,700.00. One other company <br />was responsive but ultimately decided not to quote the project while the other didn’t respond to requests. <br />The quote received is inline with other recently quoted water tower demolitions of similar nature and close <br />to the engineer’s estimate. <br /> <br />The scope of work includes removal of the water tower and foundation (to a depth of 3 feet below the <br />surface) and restoration of the site. Work would be completed in 2025. <br />
The URL can be used to link to this page
Your browser does not support the video tag.