My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCMin_58Apr10
FalconHeights
>
City Council
>
City Council Meeting Minutes
>
195x
>
1958
>
CCMin_58Apr10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2009 3:41:07 PM
Creation date
6/22/2009 3:10:56 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~i~ ~~ <br />REGUL~IR ~.fL'L:TING THURSDAY, Anril 10th, 1958 • <br />Pascal to the original flow line, and they haven't decided yet <br />Ave. whether to resod or install a bituminous surface. Nilsen <br />expressed. his opinion that it is obligatory on Lametti's part <br />to get in there and do that work. <br />David Cartz^fright, 1800 No. Albert, asked if we couldn't solve <br />all these problems by putting storm sewer in Area C. He was <br />advised we can't do it at ntesent -- the Vrork at Gottfried's <br />pit will be done this sur~~~~er but won't be ready for use until <br />fall . <br />It was stated that the problem of drainage was being studied <br />for the village as a whole. <br />L. Winfrey pointed out that the County is willing to pay its <br />share. Ljungren has worked out the cost of storm sewer in <br />Area C and would like to go over it, and the method of-financing <br />with Frank Graham. <br />Autumn D. Aide, 1998 Autumn, representing 20 or 22 families in the <br />& Prior area, presented the Council with a petition, signed by residents, <br />Streets as follows: <br />"The be],ow named citizens residing on Prior and Autumn Streets <br />in this Village a.re of the opinion that: <br />1. The street constructed by the Ray Sina Contracting Co., <br />Inc. is inadequate due to: <br />A - h:~nroper drainage. <br />B - Insufficient gravel base <br />C -Violation of basic construction principles includ- <br />ing laying of blacktop in standing Urater. <br />D - Unknown factors. <br />2. The Village should not have anrroved the construction effort, <br />particularly in view of complaints of citizens at the time of <br />construction. <br />3. Having approved this street, the Council is responsible for <br />acting to enforce the one year warranty. <br />~t. "Repair" of the existing street will not be sufficient. <br />These opinions have b-en confirmed by competent engineering <br />authority and the present condition of the street validates these <br />o*~inions beyond question. Accordingly the below named citizens <br />request that the Council direct the Pray Sina Contracting Company, <br />Inc. to replace the entire street with an adequate and acceptable <br />construction at no additional cost to the village of Falcon <br />Heights or its citizens." <br />:.4ayor Nilsen said he felt the charges in the petition were pretty <br />serious; and he felt it would be well to give the Council a little <br />time to consider them. After discussion, it was agreed that <br />P~:embers of the Council, a representative from Toltz, King, Duvall, <br />Anderson ~ Associates, Village Engineer Ljungren, and Ray Sina, <br />the contractor, if po:_sible, should meet with residents of the <br />street Saturday, at l0 A. ~T., to inspect the street and make <br />further plans. <br />
The URL can be used to link to this page
Your browser does not support the video tag.