Laserfiche WebLink
l09l~ <br />Dust Univ. Letter of October 3rd from the University of Minnesota, <br />of Minn. signed by Theo. Fenske, Associate Dean, Institute of <br />Prop. Agriculture, was read. Letter stated they have oiled. north- <br />south roads. North ~=oundary Road south of Larpenteur h.as <br />been closed off. They intend to get that into grass -- it <br />is part of their experimental plot and, th?refore, cannot <br />be oiled. The Asst. Clerk was instructed to call Mr. <br />Lindig and relay this message. <br />Larpenteur Letter of October 2nd from Attorney Graham regarding proposed. <br />Avenue improvement of Larpenteur Avenue was read. It stated ?ter. <br />Improvement Anker of the County Engineer's office advised him sufficient <br />funds will be available so that Larpenteur Avenue should be <br />imt~roved from St. Mary's Street west. to the County line. Plans <br />do not call for putting storm sewer under Larpenteur west of <br />St. Mary's on Larpenteur. Because of the uncertainty of the <br />status of the intersection at Larpenteur and Snelling, they are <br />going to do nothing at this time between Arona and St. Mary's, <br />on Larpenteur. bor. Holzer, Supt. of i'+ater Distribution, City <br />of St. Paul, advised that the City of St. Paul has no plans and <br />no necessity for extending a water main down Larpenteur west of <br />St. Mary's. If anything is to be done in this connection, it <br />would have to be done by the Village or paid. by assessments on <br />the benefitted properties. Ancker advised. plans do not call <br />for storm sewer under Larpenteur west of St. Mary's. They feel <br />existing ditches and crossings at Fry and east of Cleveland will <br />take care of normal drainage. Holzer stated that if the Village <br />has any plans for water main in this area, it should be done <br />before street work is commenced. He advised that there is a <br />16-' main up the center of Snelling to appro~dtnattely the middle <br />of Larpenteur Avenue. If we can get permission from the State <br />to cross Snelling to make this connection, we could make either <br />a 16" or a 12" connection and carry it down Larpenteur Avenue. <br />Holzer estimated a 16" main, if put in before Larpenteur was <br />improved, would cost about X12.50 per foot while a 12" main <br />would cost only about 910.00 a foot. Holzer also suggested <br />6" crossings which could be put in and capped at a cost of <br />about X5.50 afoot. <br />Nilsen pointed out that in view of the fact that it cost <br />approximately 91200.00 to install a pump at each home, it might <br />be well to consult with the owners of undeveloped land, as the <br />cost of the pumps would go a long way towards paying for the <br />water line which would give water to future homes and greater <br />fire protection. <br />After discussion, it was moved by Shavor, seconded by Nilsen and <br />unanimously voted to refer the letter to Vern Ljungren for <br />study and recommendation as to size of pipe and rough estimate <br />of costs. <br />Fee Letter of September 21~th from the Village of Edina, requesting <br />Schedules information on fee schedules for planning functions, was read. <br />It was moved by Utecht, seconded by Shavor and unanimously <br />voted that we give them the proper information and request a <br />copy of the results of their survey as offered. <br />Falcon Woods Utter from Milner W Carley & Associates dated September 29th, <br />Escrow regarding escrovr of 500.00 was read. Le~ter stated: <br />